Project Overhead Table Formats (ProjectOverhead)
Follow Vision specifications for preparing a file containing project overhead data.
Field Name | Data Type | Length | Notes |
---|---|---|---|
WBS1 |
varchar | ||
WBS2 |
varchar | ||
WBS3 |
varchar | ||
Period |
integer |
Optional. Enter an accounting period here if you want to enter separate overhead amounts for different periods. Leave this field blank if you want to enter a single job-to-date overhead amount for the project or the project/task. The format for this field is YYYYPP, where YYYY is the 4-digit year (2003) and PP is the 2 digit period (01). |
|
Amount |
decimal | Required. The amount of overhead accumulated by the project or project/task. If the project or project/task has already accumulated overhead, either through the Overhead Allocation utility or through History Loading, Vision adds the overhead amount entered here to the amount that already exists. | |
AmountProjectCurrency |
decimal | 9 | Multicurrency only. |