Configuration and Project Budgeting
Configuration options affect access to cost and burden rates. You can also control whether or not estimate-to-complete (ETC), estimate-at-completion (EAC), and job-to-date (JTD) amounts display on the Project Budget Worksheet.
Option | Description | Location |
---|---|---|
Project Budget Worksheet | This option determines your ability to view, or work with, data on the Project Budget Worksheet. | Accounting Tab of Role Security |
Labor Cost Rate/Amounts | This option determines your access to labor cost rates and amounts on the Labor Costs Tab of the worksheet. You can see the JTD Spent column on the worksheet only if you have Full Access for this option. | |
Labor Burden Rates/Amounts | This option controls your ability to work with burdened rates, which combine actual labor cost and overhead into a single detail line. | |
Project fee entering method | If the Project fee entering method option is set to
At lowest level only (system will automatically update at higher levels), then any changes you make to the following fields on the Summary tabs of the Project Budget Worksheet cause Vision to recalculate values for all elements that are higher up in the work breakdown structure:
|
General Tab of Accounting System Settings |
Synchronize Fees from Contract to Project | If this option is selected and contract information exists on the Contract Management tab of the Project Info Center, you cannot edit the compensation amounts (Direct Labor, Direct Expense, and so on) on the Budget Summary dialog box because their values are based on the contract information. | |
Enable reporting at burdened rates | This option enables burdened rates, which combine the actual labor cost and overhead into a single detail line. To calculate burdened rates, Vision uses the overhead rate from the most recent overhead allocation run. When you use burdened rates, overhead columns do not appear on the worksheet because the overhead is included in the labor columns. | Reporting Tab of Accounting System Settings |
Enable Budgeting by Vendor | This option controls whether you can view or edit the Vendor and Vendor Name columns on the worksheet. | Project Budgeting Tab of Accounting System Settings |
Show estimate to complete amounts | This option displays estimate-to-complete amounts, which tell you how much additional money must be spent from today through the end of the project to complete the work. | |
Show estimate at completion amounts | This option displays estimate-at-completion amounts, which tell you the total amount of money that will have been spent at the end of the project. | |
Show job to date amounts | Job-to-date amounts tell you how much money has been spent since the project began. |