Project Manager Sample – Variance Drilldown Performance Dashboard
The Project Manager Sample - Variance Drilldown performance dashboard compares revenue, labor total billing, expense total billing, and variance by project.
Project Manager Variance Drilldown Chart
Each bar on the Variance Drilldown by Project chart one of these measures for the indicated project.
For further analysis, you can drill down from the top work breakdown structure (WBS) level to lower levels.
Characteristic | Description |
---|---|
Chart Type | Stacked bar chart |
Measures |
Revenue Labor Total Billing Expense Billing Variance (Revenue - (Labor Total Billing + Expense Billing)) |
Drill Down | From higher levels of the work breakdown structure to lower levels |
Automatic Filters
Vision automatically filters the data to only include projects for which both of the following are true:
- The charge type is Regular.
- The project manager assigned to the project is the current Vision user. If the user is not linked to an employee in Vision, this filter cannot be applied, so the dashboard includes data for all projects.
Filter Options
You can filter the project data for this performance dashboard based on any or all of the following:
- Billing client
- Project status
- Project
- Fiscal year (Default: most recent three years)