Resource Utilization by Organization Columns Tab
Use the Columns tab to select or clear columns, change column sequence, provide new column labels, set column widths, or select number and date formats.
Sequence of Columns
If you include period columns based on your selection in View By on the General tab, that selection (for example, Week Periods) must be the last selected column in the grid on the Columns tab. The only exception is if you also select the Planned Hours After column. That column can follow the period columns.
How Reporting Period and View by Options can Affect the Number of Columns You Select
Vision uses the reporting period and your selection in View By on the General tab to determine the number of period columns to display. If you specify too long a period, the number of period columns can exceed the maximum of 20 columns. If that occurs, either specify a shorter reporting period or select a larger interval in View By.
Asterisks (*)
If the values shown in the plan rows do not add up to the total shown in the corresponding totals line, Vision marks the total with an asterisk.
Start and End Dates
Vision does not determine dates and durations for elements at higher levels of the work breakdown structure (WBS) by adding up durations at lower levels. Instead, Vision determines the dates of an element at a higher WBS level as follows:
-
The start date of a higher level element is the earliest start date assigned to one of the lower level elements under it.
-
The end date of a higher level element is the latest end date assigned to one of the lower level elements under it.
Full-Time Equivalent (FTE) Values
Whether or not full-time equivalent values are displayed on the report is determined by the Full-Time Equivalent (FTE) Reporting Includes options on the Inclusions tab. If you include them, the report displays the full-time equivalent values after the total row for each organization and after the Employee Final Total row.
Note that when it calculates the values for FTE Over/(Under) Capacity, Vision uses the rounded values displayed on the report in FTE Capacity and Demand.
FTE Values and the Resource Assignment Column
If you include full-time equivalent values for capacity and demand, select Resource Assignment as the first column for the report. Vision displays capacity values with shaded backgrounds to help you distinguish them from demand values.
If you do not select Resource Assignment as the first column, this shading does not display correctly.
Decimal Digits for Hours
Decimal settings for columns that display hours are determined by the Decimal Digits option on the General tab on the Plan Settings form ( ).
Billable and Unbillable Time
Billable time in Vision Planning is characterized as time that is mapped to regular projects, or not mapped to overhead or promotional projects. Nonbillable time in Vision Planning only includes plans that are linked to overhead or promotional projects.