Manufacturing Order Timesheet Information Subtask
Use the Manufacturing Order Timesheet Information subtask to enter manufacturing order timesheet data for this timesheet line.
You can enter manufacturing orders in Costpoint Production Control.
Use this subtask to enter data about the manufacturing order to which this timesheet is being charged.
Manufacturing Order
Field | Description |
---|---|
Manufacturing Order |
Enter, or click to select, a manufacturing order number to which this timesheet is charged. This is a required field. |
Status |
This non-editable field displays the status of the selected manufacturing order. |
Project |
This non-editable field displays the project to which selected manufacturing order has been assigned. |
Routing Operation
Field | Description |
---|---|
Operation Sequence |
Enter, or click to select, the operation sequence number of the routing operation for this manufacturing order. |
Step |
Enter, or click to select, the step number of the routing operation that is associated with this manufacturing order. |
Description |
This field displays the descriptions for both the Operation Sequence number and the Step number, if that information is available. |
Activity Type |
From the drop-down list, select Run to record hours against a manufacturing order or Set Up to record setup hours. |
Work Center |
Enter, or click to select, a work center ID to which this timesheet is charged. The name or description of the work center is displayed in the field to the right. |
OK |
Click this button to save the data and return to the Manage Timesheets screen. |