Use the Expense Reports grid to enter the information for the individual expenses. Click
+ Add Line below the grid to add a new blank row below the last existing row. The grid has two sections. You can scroll horizontally in each section, and you can drag the vertical divider that is located between the two sections to resize each side of the grid to suit your needs.
Field | Description |
|
To select the columns that you want to display in the Expense Reports grid, click this icon. On the menu that appears, click
Select Left Columns to select columns for the left side of the split grid, or click
Select Right Columns to select which row total columns to display on the right side of the grid.
On the Select Columns dialog box, select the check boxes for the columns you want to display, and clear the check boxes for those you do not want to display. (Some columns must always display. Those columns appear on the Select Columns dialog box with the check box selected, but they are disabled so you cannot clear the check box to hide them.)
The column selections only apply to you. Another user can choose to display a different set of columns. Your selections are saved and remain in effect until you change them. The columns that display by default in the grid and the columns that are available for selection on the Select Columns dialog box are determined by configuration settings in
Vision.
|
|
When you select a grid row or hover over a row, this icon appears at the right end of the row. Click
and select the action you want to perform for that row: insert a blank row below it, copy the current row (except for the amounts and expense details) as a new row below it, or delete the row.
|
Approval status
|
If
Expense Report Line Item Approval is selected on the System Expense Report Configuration form in
Vision (), this left-most unlabeled column displays each expense line item's approval status:
- Approved: The expense is approved.
-
Rejected: The expense is rejected. You must edit this expense item and resubmit.
- No indicator: Either approvals are not required or the expense line item is not approved.
You can hover over each indicator for additional details.
|
LINE
|
This column displays if the
Display line number in expense report option is selected in
Vision on the Company Expense Report Configuration form. This column displays the sequence number of the expense line, which is useful for reference purposes. For example, if line 3 is for a taxi receipt, then you can write 3 on the physical paper copy of the taxi receipt to keep track of the expense.
Initially, the lines in the Expense Report grid are numbered sequentially. However, if you insert a line between existing lines, or delete a line, the order may not remain sequential. For example, if you insert a new line between 1 and 2, then the new line becomes 3 and the order is 1, 3, 2.
|
DATE
|
Enter the date on which you incurred the expense item.
You can enter a date directly in this column or click
to select a date. When you enter a date directly,
iAccess automatically formats the date based on the date format you specify in the My Settings dialog box.
|
CATEGORY
|
Expense categories enable you to enter specific types of expenses using predefined account values.
To select a category for an expense, do one of the following in
CATEGORY:
- Enter one character from the expense category name to display a list of categories that start with that character in a drop-down list, or enter two or more characters to display a list of categories that contain those characters. Select the category you want. (Note: If only one category matches your search text in
CATEGORY, that category is automatically entered in
CATEGORY without displaying the list.)
- Click
to display the Expense Category Lookup dialog box. The available categories display automatically when the dialog box opens. If necessary, scroll to locate the category, or enter all or part of the expense category name in the search field above the list. Select the category and click
Select.
When you enter or select a category, the name of the group that is associated with the category displays in this column after the category description.
If you select a category that is associated with the Travel, General, or Business Meals detail types,
iAccess displays a message that asks if you want to enter details now for the expense. To enter detail, click
Enter Detail Now to open the Detail dialog box. You can also choose to enter the detail using the
DETAIL column. See the
DETAIL column description below for more information.
|
DESCRIPTION
|
Enter a brief description of the expense item. This description displays on various expense-related reports and can be printed on invoices.
|
DETAIL
|
If the selected expense category has associated details, click <> in this column to display the Detail dialog box and enter that additional information for the expense item.
The following are the Detail dialog boxes:
- General Detail: This dialog box displays when the selected category is associated with the General detail type or when no category is assigned. Use it to enter the business reason for the expense.
- Business Meals Detail: This dialog box displays when the selected category is associated with the Business Meals detail type. Use this dialog box to enter the business reason for the expense and the name of each person attending the meal.
- Travel Detail: This dialog box displays when the selected category is associated with the Travel detail type. Use this dialog box to enter the business reason for the expense, where you traveled from and to, and any miles or kilometers involved. If miles/kilometers are assigned and you are using the Multicurrency feature in
Vision,
iAccess checks the
CURRENCY CODE column to ensure that the assigned currency matches the functional currency for the employee's company. If they are different, an error message displays and the
CURRENCY CODE column changes to the functional currency. In addition, if you make changes to the miles/kilometers, the amount in the
AMOUNT column on this grid is updated accordingly.
After you enter detail for an expense,
Details Added displays in the column. After you enter the details for a category, you can click
Edit to edit the details as needed.
Note that this column is not editable in the following situations:
- If No Detail is the detail type associated with the category. In that case,
n/a
displays in the
DETAIL column.
- If the expense item is approved.
If you need to delete all of the detail information, open the Detail dialog box and select
Clear All & Close. The detail is removed from the dialog box and the
Details Added text is removed from the
Detail column.
See the help topics for each of the Detail dialog boxes for additional information.
|
ORIGINATING VENDOR
|
Enter the vendor number of the vendor from whom the expense item was originally purchased. For example, an employee may have paid for a hotel room and a plane ticket. You can associate the expense items with the specific hotel and airlines vendor.
This column displays only if your system administrator selected the
Enable Originating Vendor for Employee Expenses and A/P Vouchers option on the Tax Auditing tab of the Accounting Company Settings form in
Vision ().
To select an originating vendor for an expense, do one of the following in
ORIGINATING VENDOR:
- Enter one character from the vendor name or number to display a list of vendors that start with that character in a drop-down list, or enter two or more characters to display a list of vendors that contain those characters. Select the vendor you want. (Note: If only one vendor matches your search text in
ORIGINATING VENDOR, that vendor is automatically entered in
ORIGINATING VENDOR without displaying the list.)
- Click
to display the Originating Vendor Lookup dialog box. The available vendors display automatically when the dialog box opens. If necessary, scroll to locate the vendor, or enter all or part of the vendor name or number in the search field above the list. Select the vendor and click
Select.
Vendors included in this list are those that are marked as approved for use in processing in the Vendor Info Center for your current company and are available based on your security role.
You can select active or inactive vendors, but not dormant vendors.
|
ORIGINATING VENDOR NAME
|
This column displays the name of the originating vendor.
This column is available for display if the
ORIGINATING VENDOR column is available for display. You can display
ORIGINATING VENDOR NAME whether or not you choose to display
ORIGINATING VENDOR.
|
COMPANY PAID
|
This column displays only if your system administrator selected the
Allow entry of company paid items option on the Company Expense Report Configuration form in
Vision () for the employee's company. Select this check box if the expense is company paid. Company-paid expenses are reimbursed to the vendor, not the employee.
A common example of a company-paid item is when you purchase an airline ticket for business travel, and the airline charges your company instead of you for the expense. Your company pays the airline for the ticket, but you add it to your expense report to create an audit trail and charge it to the appropriate project.
If a credit card defined as "company paid" is assigned to the expense line, the
COMPANY PAID option is automatically selected, and you cannot clear it. If a credit card defined as "employee paid" is assigned, the
COMPANY PAID option is automatically selected, and you cannot clear it.
|
CREDIT CARD
|
If a credit card is assigned to the expense line, the credit card's code displays in the
iAccess expense report for reference. All credit card updates must be made in Expense Reports in
Vision.
|
MERCHANT DESCRIPTION
|
If a credit card is assigned to the expense line, the associated merchant description displays in this column. This is the merchant or description from the credit card statement that helps employees identify a charge.
|
CURRENCY CODE
|
This column displays only if you are using the
Vision Multicurrency feature. Use the
Currency Code column to specify the currency that applies to the amounts in
AMOUNT,
TOTAL TAX AMOUNT, and
NET AMOUNT for the expense item. For example, if you submit an expense report following a business trip to multiple countries, you might enter
USD for one line item,
EUR for another, and
CAD for yet another.
To select a currency code, do either of the following in
CURRENCY CODE:
- Enter one or more characters from the currency code to display a list of codes that contain those characters in a drop-down list. Select the code you want. (Note: If only one code matches your search text in
CURRENCY CODE, that code is automatically entered in
CURRENCY CODE without displaying the list.)
- Click
to display all available currency codes in a drop-down list. Select the code you want..
If you use the Currency Override dialog box to specify a different transaction currency, it will apply to any new expense items that you subsequently add to the grid.
Note: If you assign miles/kilometers for the expense report in the Travel Detail dialog box,
iAccess checks the
CURRENCY CODE column to ensure the assigned currency matches the employee's company's functional currency. If they are different, an error message displays, the employee's company functional currency is entered in
CURRENCY CODE, and you cannot change it.
If a "company paid" credit card is assigned to the expense line, the currency code associated with the credit card displays in the
CURRENCY CODE field for reference. In that case, you cannot select a different currency. If the credit card for an expense line is "employee paid," the
CURRENCY CODE field behaves as it does when no credit card is involved.
|
AMOUNT
|
Enter the expense amount in this column.
When you enter an amount in this column with tax auditing enabled, the amount in this column is used to calculate the taxes that prefill in the
TOTAL TAX column in this grid. If amounts are entered in the
PAYMENT AMOUNT and
NET AMOUNT columns, any updates that are made to those columns automatically update the amount in this column.
If you assign travel detail to the expense, and you make changes to the mileage/kilometer-related entries on the Travel Detail dialog box,
AMOUNT automatically updates accordingly.
If you use the
Vision Multicurrency feature and the assigned transaction currency and functional currency codes are different, the
AMOUNT column is used to calculate the amount in
PAYMENT AMOUNT as follows:
AMOUNT X
PAYMENT EXCHANGE RATE. If a credit card is assigned to the expense line, this column displays the amount of the charge in the credit card receipt's currency.
|
PAYMENT EXCHANGE RATE
|
If you use the Multicurrency feature, use this column to specify the exchange rate. This is the rate at which one currency is exchanged for another.
The amount in
AMOUNT multiplied by the rate in this field is the amount in
PAYMENT AMOUNT. If you change any of these amounts, the others are automatically updated.
You can change the payment exchange rate if the code in
CURRENCY CODE does not match the functional currency for the employee's company. If you change the assigned
CURRENCY CODE, the payment exchange rate is automatically updated.
The
PAYMENT EXCHANGE RATE displays a default rate in the following situations:
- If the transaction currency and functional currency differ, and you use the Currency Override dialog box to specify an override other than
None,
iAccess applies the exchange rate based on the assigned date or rate method on the Currency Override dialog box.
- If the transaction currency and functional currency differ, and you use the Currency Override dialog box to specify
None as the override,
iAccess applies the daily exchange rate that is entered in
Vision.
If a credit card is assigned to the expense line, the following is considered for the payment exchange rate:
- If the expense item is linked to an imported credit card charge and the currency for the expense amount differs from the payment amount currency (the currency for the primary credit card),
iAccess uses the
AMOUNT and
PAYMENT AMOUNT fields to automatically calculate the exchange rate. In that case, you cannot change the exchange rate.
- If the expense item is not linked to an imported credit card charge but has a credit card assigned, and the currency for the expense amount differs from the payment amount currency, the exchange rate is recalculated if the date is changed.
|
PAYMENT AMOUNT
|
If you use the Multicurrency feature in
Vision, this column displays the amount to be paid to the employee, in their functional currency. This is calculated by multiplying the expense amount in
AMOUNT by the exchange rate in
PAYMENT EXCHANGE RATE after any exchange overrides have been applied. As you change these amounts, the others automatically update and are stored in the functional currency of the employee's company.
If the code in
CURRENCY CODE does not match the company's functional currency, you can enter or change the payment amount. If the currencies are the same,
PAYMENT AMOUNT displays the same amount as
AMOUNT and is not editable.
If a credit card is assigned to the expense line, the amount in this column is the amount that will be paid to one of the following:
- Employee: Expenses that are not company paid are made in the functional currency of the employee's company.
- Credit card company: Company-paid expenses that have an assigned credit card are paid in the currency that is assigned to the primary credit card.
- Merchant or vendor
: Company-paid expenses that do not have an assigned credit card are paid in the functional currency of the employee's company.
The amount is the transaction amount in the credit card currency. For example, if a United States employee took a trip to Japan and used a US credit card, the amount in
PAYMENT AMOUNT is in US currency.
If the payment amount is not in the same currency as the functional currency of the employee's company, the amount displays in a blue font. (A blue diamond also displays next to the column heading as an additional visual indicator that the column contains amounts in more than one currency.) The blue amounts are excluded from the expense report totals.
|
EXCHANGE OVERRIDE
|
This column displays the payment exchange override information from the Currency Override dialog box that applies to the expense row:
- None: No override applies to the row.
- Date - <date>: The exchange rate for the specified date is used to calculate the payment amount in the employee's functional currency.
- Rate - <rate>: The specified exchange rate is used to calculate the payment amount in the employee's functional currency.
If the
CURRENCY CODE,
PAYMENT EXCHANGE RATE, and
PAYMENT AMOUNT cannot be selected for display, you cannot display this column.
|
TOTAL TAX AMOUNT
|
If you use the Tax Auditing feature, this column displays the calculated tax amount for the expense item. Configuration options determine if the
Total Tax Amount
prefills in this column, or if you will have access to the
icon to open the Taxes dialog box to enter tax code information.
A default amount displays if an expense category is assigned and it has default tax codes, or if a category is assigned and default tax codes are assigned on the Accounting Company Settings form. If the selected category has associated default tax codes entered on the Expense Categories Configuration form, then the tax rates that are entered for those default tax codes are applied to the amount in
AMOUNT to calculate the total tax amount. You can only change these codes if the
Allow staff users to change tax codes option is selected on the Expense Report Categories form in
Vision ().
When no default displays in
TOTAL TAX AMOUNT and the category's configuration allows, click in the column to open the Taxes dialog box. Use this dialog box to view, add, or remove tax codes and recalculate the tax amount, or to change the tax amount. When you use the Taxes dialog box to change the amount, the amount in the
NET AMOUNT column is updated automatically.
|
NET AMOUNT
|
If you use the Tax Auditing feature, this column displays the total net amount: Expense amount in
AMOUNT less the tax amount in the
TOTAL TAX AMOUNT.
You can change the amount directly in this column. This results in automatic updates to the amounts in the
AMOUNT and
PAYMENT AMOUNT columns.
|
PROJECT and/or PROJECT NAME
|
You can display the
PROJECT column, the
PROJECT NAME column, or both.
To select a project, do either of the following in
PROJECT or, if
PROJECT is not displayed, in
PROJECT NAME:
- Enter one character from the project number or short or long name to display a list of projects that start with that character in the Project/Phase/Task Lookup dialog box, or enter two or more characters to display a list of projects that contain those characters. Select the project you want and click
Select. (Note: If only one project matches your search text in
PROJECT and that project has no phases, that project number is automatically entered in
PROJECT without displaying the lookup dialog box.)
- Click
to display the Project/Phase/Task Lookup dialog box. The dialog box opens with a list of projects displayed. Scroll to locate and select the project, or enter all or part of a project number or short or long name in the search field above the list. If the project has phases, also select a phase, and if the phase has tasks, select a task. Click
Select to complete the entry.
These additional settings affect what projects are available for selection:
- Apply Project access to: Expense Report: If selected, your access is subject to the record level access for projects defined for your security role on the Record Access tab of the Roles form ().
- Treat inactive Projects as dormant: If selected on the Setup tab of the Company Expense Report Configuration form (), inactive projects are not available for selection. If it is not selected, you can select an inactive project, but
iAccess first asks you to confirm that is what you want to do.
|
PHASE and/or PHASE NAME
|
You can display the
PHASE column, the
PHASE NAME column, or both. When you select a project for an expense and that project has phases, you also select a phase in the Project/Phase/Task Lookup dialog box, and it displays in
PHASE and/or
PHASE NAME.
If you need to change the phase, do either of the following in
PHASE or, if
PHASE is not displayed, in
PHASE NAME:
- Enter one character from the phase number or name to display a list of phases that start with that character in the Phase/Task Lookup dialog box, or enter two or more characters to display a list of phases that contain those characters. Select the phase you want and click
Select. (Note: If only one phase matches your search text in
PHASE and that phase has no tasks, that phase number is automatically entered in
PHASE without displaying the lookup dialog box.)
- Click
to display the Phase/Task Lookup dialog box and change your selection. The phases display automatically when the dialog box opens. If necessary, scroll to locate and select the phase, or enter all or part of a phase number or short or long name in the search field above the list. If the phase has tasks, also select a task. Click
Select to complete the entry.
If
Treat inactive Projects as dormant
is selected on the Setup tab of the Company Expense Report Configuration form (), inactive phases are not available for selection.
|
TASK and/or TASK NAME
|
You can display the
TASK column, the
TASK NAME column, or both. When you select a phase for an expense and that phase has tasks, you also select a task in the Project/Phase/Task Lookup dialog box or Phase/Task Lookup dialog box, and it displays in
TASK and/or
TASK NAME.
If you need to change the task, do one of the following in
TASK or, if
TASK is not displayed, in
TASK NAME:
- Enter one character from the task number or name to display a list of tasks that start with that character in a drop-down list, or enter two or more characters to display a list of tasks that contain those characters. Select the task you want. (Note: If only one task matches your search text in
TASK, that task number is automatically entered in
TASK without displaying the list.)
- Click
to display the Task Lookup dialog box and change your selection. The tasks display automatically when the dialog box opens. If necessary, scroll to locate the task, or enter all or part of a task number or short or long name in the search field above the list. Select the task and click
Select.
If
Treat inactive Projects as dormant
is selected on the Setup tab of the Company Expense Report Configuration form (), inactive tasks are not available for selection.
|
BILL
|
Select this check box to indicate that the project's client should be billed for the expense item. This check box is only enabled when the project has the Regular charge type.
This column works in conjunction with the
Bill by Default and
Billable Message columns on the Time & Expense tab of the Project Info Center.
iAccess automatically selects this option when:
- The
Bill by Default option is set to
Yes for the lowest level of the project's work breakdown structure..
- A category is assigned to the lowest level of the project's work breakdown structure and the
Bill by Default option is set to
Category
. In this case, the
BILL check box in
iAccess defaults to match the category's
Bill by Default setting on the Expense Report Categories form ().
|
ACCOUNT and/or ACCOUNT NAME
|
You can display the
ACCOUNT column, the
ACCOUNT NAME column, or both.
To select an account, do one of the following in
ACCOUNT or, if
ACCOUNT is not displayed, in
ACCOUNT NAME:
- Enter one character from the account number or name to display a list of accounts that start with that character in a drop-down list, or enter two or more characters to display a list of accounts that contain those characters. Select the account you want. (Note: If only one account matches your search text, that account is automatically entered in
ACCOUNT and/or
ACCOUNT NAME without displaying the list.)
- Click
to display the Account Lookup dialog box and change your selection. The accounts display automatically when the dialog box opens. If necessary, scroll to locate the account, or enter all or part of the account number or name in the search field above the list. Select the account and click
Select.
An account number may default in this column depending on the category, project, phase, task, and billing options that you enter for the expense item and on the expense report configuration options that are selected by your system administrator.
The list of accounts available for selection is based on the project's charge type:
- Overhead or Promotional — The accounts that display are indirect, asset, liability, net worth, and other charges.
- Regular (and the
Bill
option is selected) — The accounts that display are reimbursable and reimbursable consultant.
- Regular (and the
Bill
option is not selected) — The accounts that display are direct and direct consultant.
Note: Each expense item must have an account. If an account is assigned to the expense category, that account displays by default in
ACCOUNT when you select the category. If no account is assigned to the category, you must assign an account before you can submit the report.
|
RECEIPTS
|
Use this column to associate receipts with the expense item. This column displays if
Vision is configured to allow you to upload and attach documents to certain types of transactions. See the
Vision Advanced Technical Administration Guide for detailed information on enabling FILESTREAM and Transactional Document Management (TDM).
Select an expense item and click
in the
RECEIPTS column. The Expense Line Receipts dialog box displays listing all receipts that are attached to the expense report. Either use this dialog box to upload a new receipt file, or select the
Attached to Selected Expense check box to attach one of the listed receipts to the current expense item.
|