Field | Description |
Reimb. Consultant Billing Markup
|
When you display the Consultants page, this field displays above the charts on the Planning toolbar and shows the reimbursable consultants billing markup rate method for the plan. For
iAccess plans, this is set on the Consultants tab on the Plan Settings dialog box, and for
Vision plans, this is set on the Rates tab in Project Planning. If a project has multiple
Vision plans that are in utilization, this field displays the value from the plan with the earliest creation date.
The following are the possible values:
- If the rate method is Multiplier Only, this field displays
Multiplier.
- If the rate method is Account Rate Table or Category Rate Table, this field displays
Table.
- If the rate method is None, this field displays
No Markup.
|
LEVEL/CONSULTANT TYPE
|
This column displays the name of the WBS element, as specified in the
Vision Project Info Center.
- For
iAccess plans, the WBS elements only display for those rows that are at or above the selected planning level for consultants as specified in
iAccess Plan Settings.
- For projects with
Vision plans, WBS elements are shown for the highest planned level and above. For example, if the project has phases and tasks, and some consultants were planned at the phase level while others were planned at the task level, the
iAccess Consultants grid displays all of these consultants under the phase row. The task row is not shown.
- For projects with no plan, all of the project's WBS elements are shown.
|
START DATE and END DATE
|
These columns display the start and end dates for the WBS element as defined on the Labor page. If these dates are changed on the Labor page, they will automatically update on the Consultants page as well.
You cannot see consultants assigned to calendar periods within
iAccess. When you save
an iAccess plan, consultant amounts are spread evenly across the time period defined by the WBS element's start and end dates.
If you are using the
Vision Resource Planning module and you need to see the time-phased consultant amounts for
an iAccess plan, open the plan in
Vision Project Planning.
|
CONTRACT
|
This column displays the sum of the selected WBS level's direct consultant and reimbursable consultant amounts as defined on the Budget & Revenue tab in the Project Info Center in
Vision.
|
BASELINE
|
This column displays baseline planned consultant amounts. This amount is summed to higher levels of the WBS.
If the project has multiple
Vision plans that are included in utilization,
iAccess sums the baseline amounts from the plans.
|
PLANNED
|
This column displays if the budget type is Cost or Cost and Billing, or if the budget type is billing and the rate method is None. It the budget type is Cost, the column displays the sum of the planned cost amounts for consultants for the WBS element. If the budget type is Cost and Billing, it displays the sum of either the planned cost or planned billing amounts for consultants for the WBS element, depending on your selection in
Show.
If the project has multiple
Vision plans that are included in utilization,
iAccess sums the planned amounts from the plans.
iAccess provides a notification when the budget type is Billing and the WBS row's planned bill amount does not match the row's contract amount. A yellow flag () displays in the column. Each WBS row amount is checked, and a flag can display for any row.
|
PLANNED COST
|
This column displays if the budget type is Billing and the rate method is Multiplier Only, From Account Rate Table, or From Category Rate Table. The column displays the sum of the planned cost amounts for consultants for the WBS element.
|
PLANNED BILLING
|
This column displays if the budget type is Billing and the rate method is Multiplier Only, From Account Rate Table, or From Category Rate Table. The column displays the sum of the planned billing amounts for consultants for the WBS element.
iAccess provides a notification when the budget type is Billing and the WBS row's planned bill amount does not match the row's contract amount. A blue flag () displays in the column. Each WBS row amount is checked, and a flag can display for any row.
|
JTD
|
This column displays the sum of the charges to direct consultant and reimbursable consultant accounts on all posted transactions and committed purchase orders through today. This amount is summed to higher levels of the WBS.
iAccess provides a notification when the budget type is
Cost and the JTD amount is greater than the planned amount. A red flag () displays in the column. Each WBS row amount is checked, and a flag can display for any row.
|
ETC
|
This column displays the sum of the estimate-to-complete as calculated by
iAccess for consultants.
ETC amounts for consultants are calculated differently, depending on whether the project plan is
an iAccess plan or a
Vision plan.
- iAccess plan: If Planned consultants - JTD consultants is greater than 0, then ETC consultants = Planned consultants - JTD consultants. If Planned consultants - JTD consultants is less than or equal to 0, then ETC consultants = 0.
- Vision plan: ETC consultants = Sum of planned consultants from tomorrow forward
|
CONTRACT BALANCE
|
If you view billing amounts, this column displays the contract balance in the billing currency: Contract amount - JTD amount through today. If JTD amount is greater than the contract amount, the balance displays as negative and is red.
If you view cost amounts, the
MARKUP column displays instead.
|
MARKUP
|
If you view cost amounts, this column displays the markup in the cost currency: Contract amount - Planned cost amount.
If you view billing amounts, the
CONTRACT BALANCE column displays instead.
|