Actuals

The costs actually incurred and recorded in accomplishing the work performed within a given time period. This is a special reporting set used in a number of standard reports and can change based on the terminology setting. By default in v4.x this set was titled ACWP. In v5.0, by default, is Actuals. This value appears in the Control Account pane of the Project View.