Perform Risk Analysis with Current Settings

Use this procedure to perform risk analysis with the current settings.

Note: If you wish to perform risk analysis without displaying the Risk Analysis dialog box, click the Perform Risk Analysis button on the Processes tab. When you perform risk analysis using this method, the settings stored on the Risk Analysis dialog box control the operation. If you have not entered a Time Now for the project, Open Plan automatically displays the Risk Analysis dialog box before you can proceed.

To perform risk analysis:

  1. Select the project for which you want to perform risk analysis.
  2. On the Processes tab, click the Perform Risk Analysis button.
    Open Plan informs you if an error condition is detected during the session. You can use the Log Viewer to examine the error in the session log.

Related Topic