Contents of the Project View Form
Use the fields and options on the Project View form to review resource assignments and schedules for your projects, assign employees and generic resources to your projects, and enter planned hours for those assignments. You can also use the grid to reassign work from one resource to another and to reschedule planned hours.
Header Fields
Field | Description |
---|---|
Find project | At the top of the Project View form, enter either a partial or complete name or number in the
Find project field to find and select an existing project to view or edit.
Your current record selection will be preserved if you switch to another application and then return to this form. For information about creating and using searches, see the Search Vantagepoint help topics. |
Search Navigation Controls |
The Search Navigation Controls display to the right of the Find lookup field at the top of most Vantagepoint hub and application forms. Use these controls and their related components to quickly locate a saved search, create ad hoc or new searches, page through records, and find and select multiple hub records. On the Saved Search control (), click to display the Saved Searches (left) pane and Record Selection (right) pane. Most search types include standard, personal (My Searches), shared, and complex searches, as well as an ad hoc search Selection. Available search types vary, depending on the active hub or application form. For more information about Search Navigation Controls, see Search Quick Reference, Components of a Search, and Use Search Navigation Controls to Filter Records. |
Saved Searches list | To filter the list of projects, select one of the following search types:
For these searches, a project is considered active if the status of the project-level WBS element is Active. The project search list sort order option that you select on the My Preferences dialog box determines the order in which the projects display in the list: by name or by number. To change that setting, click on the main Vantagepoint toolbar. If warning conditions exist for any of the projects and Show Project Warning Indicators is selected on the Project Settings dialog box, a red or yellow warning indicator (, for example) displays next to them on the list. You can hover over or tap an indicator to display a description of the warning condition. |
x of x |
Use these arrow icons to scroll through the records in the search results and display a different record on the form. The numbers indicate which record you are viewing out of the total number of records in the search results. |
Actions Bar
Click Actions to select one of these options.
Field | Description |
---|---|
Check In Plans |
Select this option to display the Check In Plans dialog box and check in one or more of the plans that are currently checked out. When you select a row in the grid, the project's entire plan is automatically checked out to you. While it is checked out, other users can view it but cannot make changes to it until it is checked back in. Vantagepoint automatically checks in plans when you select a different project, navigate to another part of Vantagepoint, log out of Vantagepoint, navigate to a different URL, use the browser's Refresh option, or close the browser. However, there may be situations in which you must use this option to manually check in plans. |
Open in Projects |
Select this option to display data for the currently selected project in the Projects form. |
Print Report |
Select this option to display the Reporting form so you can generate a Resource Planning report or other report. |
Grid Options
Field | Description |
---|---|
Scale |
To change the scale for the calendar period columns, click and select one of the following options on the Change Scale dialog box:
The calendar period column headings change to reflect your selection, and any existing hours in those columns are recalculated based on the new scale. |
If the plan date range includes more than 50 calendar periods, based on your selection in Scale, you must use this date range selector to display some of those periods. Click or in the date range selector to load earlier or later sets of calendar periods. (You can also click the earliest or latest date in the date range selector to load a new set of periods.) For example, if you click in the date range selector, Vantagepoint retains the most recent 25 of the currently loaded calendar periods and loads the next 25 later calendar periods so you can scroll them into view as well. If 50 or fewer calendar periods exist in the plan date range, you can view all of them by scrolling the grid horizontally, so the date range selector does not display on the toolbar. |
|
Click this icon above the upper-right corner of the grid to display the Grid Settings dialog box and then do any of the following:
|
Grid Columns: Left Section
This section of the grid displays the WBS elements at each level of the plan WBS for the selected project. For the lowest-level WBS elements, it also displays the resources assigned to that element.
To change the width of the left grid section, position the mouse pointer over the dividing line between the left grid section and the middle grid section, and drag the line.
Field | Description |
---|---|
Click this icon to display brief descriptions of all of the summary columns that you can select for the middle section of the grid. Click More at the bottom of the list of column descriptions to display a related help topic. |
|
Plan availability icons |
The first time that you select a plan row, one of the following icons displays to the left of the project at the top of the plan structure:
|
Level/Resource |
This column displays the plan WBS elements and, for each lowest-level WBS element, the currently assigned resources. You can expand and collapse the plan levels. To add a resource assignment for a WBS element, hover over that plan row to display in the Level/Resource field, and click the to display the Assign Resources to Project dialog box. The plan must be checked out to you and the row must be eligible to have assignments. The Status column in the middle grid shows the status for the currently selected WBS row (project, phase, or task): (Active), (Inactive), or (Dormant). You cannot add new assignments for a dormant element or any elements under it in the WBS, but you can edit, delete, reassign, or reschedule existing assignments. In addition to resource assignments that you add yourself, the grid may also include assignments for employees with no planned hours but with JTD hours charged to a lowest-level plan element. Vantagepoint creates those assignments automatically. If the relevant branch of the plan WBS either includes the labor code from the time record (exact match or wildcard match) or does not include that labor code but includes other labor codes, that resource assignment is made under the labor code level, based on the time record labor code and the labor code options specified for the plan. If the relevant branch of the plan WBS includes no labor codes, Vantagepoint assumes that you do not want to plan at the labor code level and makes the resource assignment under the lowest-level project WBS element, rather than under a labor code. If an assigned resource is an employee, click the employee name to display information about the employee in the Employee Card dialog box. If the assigned resource is a generic resource, click the resource name to display information about the resource in an info bubble. In WBS rows, click the WBS element to display information about that element. Click the Open in Projects link in the info bubble to leave Project View and display the plan in the Plan form in the Projects hub. By default, only names display for WBS elements, but you have the option to display numbers along with the names. Click next to the upper-right corner of the grid and select the Show Project Numbers checkbox in the Grid Settings dialog box. |
Show less and Show more |
Use these links at the top of the Level/Resource column to hide or show the summary columns you have selected for display in the middle section of the grid. Hiding those columns provides space to display more detail columns. If the summary columns are visible, click Show less to hide them. The link then changes to Show more. Click that link to display the summary columns again. You can pin individual columns if you want them to display even when you click Show less. Click next to the upper-right corner of the grid. On the Grid Settings dialog box, click the to the right of each column that you want to "pin" to the grid. |
To add a resource assignment for a WBS element, hover over that plan row and click in the Level/Resource field in the row to display the Add Resources to Project dialog box. (If does not display when you hover, the plan is not yet checked out to you. Click the row to check out the plan.) |
Grid Columns: Middle Section - Default Columns
The columns described below can be displayed in the middle section of the grid. Click next to the upper-right corner of the grid to open the Grid Settings dialog box from which you can add or remove columns.
To change the width of the middle grid section, position the mouse pointer over the dividing line between the middle grid section and the right grid section, and drag the line.
The following columns are displayed by default:
Field | Description |
---|---|
Status | This column displays the status of the currently selected WBS or resource row: (Active), (Inactive), (Dormant), or (Terminated). |
Has Predecessor | This column displays a checkmark if the WBS level has at least one predecessor. |
Plan Start |
For a WBS row, this column displays the plan start date for the WBS element. Vantagepoint provides default plan dates when it creates the plan initially (see Default Plan Dates for New Projects for details). Review those default dates and change any that are not correct. If you change this date and the row has no planned hours, a message displays asking if you want to move the plan end date also to preserve the same number of days between the two dates. If you change this date and the row has planned hours, the Reschedule dialog box displays so that you can specify how you want the hours distributed when the plan is rescheduled. If you select a date that is earlier than the plan start date for any higher-level WBS elements in the same branch, those plan start dates are adjusted accordingly. If you select a date that is later than either the plan start dates for any lower-level WBS elements or any assignment start dates in the same branch, those start dates are adjusted accordingly. |
Plan End |
For a WBS row, this column displays the plan end date for the WBS element. Vantagepoint provides default plan dates when it creates the plan initially (see Default Plan Dates for New Projects for details). Review those default dates and change any that are not correct. If you change this date and the row has planned hours, the Reschedule dialog box displays so that you can specify how you want the hours distributed when the plan is rescheduled. If you select a date that is later than the plan end date for any higher-level WBS elements in the same branch, those plan end dates are adjusted accordingly. If you select a date that is earlier than either the plan end dates for any lower-level WBS elements or any assignment end dates in the same branch, those end dates are adjusted accordingly. |
Assignment Start |
For a WBS row, this column displays the start date for the earliest resource assignment for that WBS element. For a resource row, this column displays the start date for that resource's assignment for its parent WBS element. You can enter or select the date. If you change this date and the resource row has no planned hours, a message displays asking if you want to move the assignment end date also to preserve the same number of days between the two dates. If you change this date and the resource row has planned hours, the Reschedule dialog box displays so you can specify how you want the hours distributed when the assignment is rescheduled. If you change this date in a way that places any part of the assignment date range outside of the plan date range for the parent WBS element, a message displays asking if you also want to change the plan date range. Click Change Dates to have Vantagepoint adjust the plan dates to include the complete assignment date range. It is possible that plan dates at higher levels of the WBS may also be changed so that they include all plan dates below them in the structure. |
Assignment End |
For a WBS row, this column displays the end date for the latest resource assignment for that WBS element. For a resource row, this column displays the end date for that resource's assignment for its parent WBS element. You can enter or select the date. If you change this date and the resource row has planned hours, the Reschedule dialog box displays so you can specify how you want the hours distributed when the assignment is rescheduled. If you change this date in a way that places any part of the assignment date range outside of the plan date range for the parent WBS element, a message displays asking if you also want to change the plan date range for that row. Click Change Dates to have Vantagepoint adjust the plan dates to include the complete assignment date range. It is possible that plan dates at higher levels of the WBS may also be changed so that they include all plan dates below them in the structure. |
Planned Hours |
For a WBS row, this column displays the sum of all planned hours (past and ETC hours) for the resources assigned to that WBS element. For a resource row, this column displays the sum of the past and ETC hours for that resource's assignment for its parent WBS element. |
JTD <date> Hours |
For a WBS row, this column displays the sum of the job-to-date (JTD) actual hours charged to the WBS element by assigned resources, through the JTD date. The JTD date displays as part of the column heading. For a resource row, this column displays the JTD actual hours charged for that resource to the WBS element, through the JTD date. |
ETC Hours |
For a WBS row, this column displays the sum of all ETC hours for the resources assigned to that WBS element. The ETC hours are planned hours for dates in each assignment range beginning the day after the JTD date. For a resource row, this column displays that resource's total ETC hours for its parent WBS element. You can enter hours in this field for any WBS element at any level of the WBS, if that element has resources assigned. When you do, Vantagepoint allocates the hours to resources and to future calendar periods for that assignment row. If you enter total ETC hours for a parent WBS element and then expand the WBS in the Project View grid to display assignment rows at lower levels, Vantagepoint further allocates the hours to each calendar period for each lower-level row, including the resource rows. Likewise, if you change the scale of the calendar period columns (from Weeks to Months, for example), Vantagepoint reallocates the hours for the new scale. If you enter hours in this field for a resource, Vantagepoint allocates the hours to the future calendar periods for that resource assignment. How the hours are allocated to resources and to calendar period grid columns depends on whether or not ETC hours have already been entered in calendar period columns for the affected assignments:
If the assignment date range for the row includes no more work days that are later than the JTD date, you cannot enter hours in this field. |
EAC Hours | This column displays the estimate-at-completion hours for the WBS elements and resources: JTD hours + ETC hours. |
Calculated % Complete | This column displays the percent complete for the WBS elements and resources: (JTD hours / EAC hours) x 100. |
In addition to the columns displayed by default, you can add the following additional columns from the Grid Settings dialog box:
Field | Description |
---|---|
Booking |
This column displays the booking status of each row. If your security role is configured to allow you to hard book assignments, you can select a different booking status for plan rows. Changing booking status for an assignment does not change any calculated values, nor does it affect your ability to make changes to the assignment dates or hours or to reassign it. What is displayed in this column and whether or not you can change booking status depends on the type of row:
If Vantagepoint is not configured to use soft and hard booking, this column is not available to be added to the grid. |
Has Successor | This column displays a checkmark if the WBS level has at least one successor. |
Grid Columns: Right Section
This grid section displays planned hours by calendar period for the selected project.
Field | Description |
---|---|
Calendar period columns |
Use the calendar period columns in the third grid section to view or enter planned hours by day, week, or month. Your selection in Scale determines whether each calendar period column represents a day, week or month. The number of calendar period columns depends on the scale you select and on the plan start and end dates. You may need to scroll horizontally to view later periods. You can enter hours in a calendar period column for any WBS element at any level of the WBS if that element has resources assigned and if the calendar period includes at least one work day for those resources that is later than the JTD date. When you do,
Vantagepoint allocates the hours to the assigned resources and to their individual work days. How the hours are allocated to resources depends on whether or not ETC hours already exist for the calendar period for the affected assignments:
If you enter hours in a calendar period column for a resource row,
Vantagepoint allocates the hours to the work days in the calendar period that are later than the JTD date:
On resource rows only, you can enter hours for calendar periods that are outside of the resource's current assignment date range, In that case, Vantagepoint adjusts the assignment dates to include that calendar period. You can also enter hours for a calendar period that includes no working days. If that calendar period currently has hours for the resource assignment, the hours you enter are allocated to days in proportion to each day's current hours. If the calendar period has no hours for the resource assignment, the hours you enter are allocated equally to each day in the calendar period. If a calendar period date range includes some dates that are on or before the JTD date and some dates that are after the JTD date, you can enter planned hours for that calendar period. To do that, click in that calendar period field to display a drop-down dialog box that shows both the hours for past days in the period and the current ETC hours. You can enter or change the ETC hours. The grid cell then displays the updated sum of the past hours and ETC hours. If you set up multiple companies in Vantagepoint, you can display plans for projects from any of those companies in Project View. Each of those companies could have different starting days for their work weeks. Because of that, Project View always uses the starting day of the week that is specified for the user's currently active company. |
Row Options
Field | Description |
---|---|
and |
If displays at the end of the row for a WBS element, notes exist for that plan element. Click the icon to view or change the notes or to enter additional notes. If displays at the end of the row, no notes exist for the WBS element. To add a note, click . The plan notes are also displayed in an info bubble, along with other information for a WBS element, when you click on the element name in any of the planning grids in the Projects hub or in Resource Management. |
This icon displays at the end of the row when you click or hover over a grid row. Click the icon to select one of these actions for that row:
|