This subtask displays the EBOM components for the provisional part (in the main screen table window) where it exists as an unreleased assembly. Information displays in this subtask for the single EBOM level in which the provisional part exists for the given configurations and effective dates. You assign EBOM components to parts on the Manage Engineering Bills of Material and Release Engineering Bills of Material screens in Bills of Material.
This table window displays the component part information that is assigned to the provisional part in the Manage Engineering Bills of Material screen in Bills of Material. Both standard and provisional parts display if they are assigned to the EBOM assembly.
This column displays the line number in which the component appears for the EBOM.
This column displays the find number in which the component appears for the EBOM.
This column displays the part ID of the component.
This column displays the part revision (if applicable) of the component.
This column displays the part description of the component.
This columns displays the component's status. For standard parts, the part status is established on the Manage Parts screen. Valid system-defined options are: Estimating, Obsolete, Pre-Release, Released and Phase-Out. This column displays Provisional for components that are provisional parts.
This column displays the provisional part type if the component part is a provisional part. Provisional part types are established on the Manage Provisional Part Types screen, and can be assigned on the Manage Provisional Parts screen.
This column displays the component type code for the EBOM:
B — Buy with Components
S — Standard
P — Phantom
R — Reference
T — Tool
D — Deleted
This required value defaults from the Manage Parts screen (for regular parts) or from the Manage Provisional Parts screen (for provisional parts).
This column displays the quantity type code that specifies how component requirements are calculated in the EBOM:
A — Per Assembly
O — Per Order
R — As Required
This column displays the required component part quantity for the EBOM.
This column displays the inventory unit of measure for the component from the Manage Parts screen (for standard parts), or the Manage Provisional Parts screen (for provisional parts).
This column displays M if the component is a Make part or B if it is a Buy part. This value defaults from the Manage Parts screen (for regular parts) or Manage Provisional Parts screen (for provisional parts).
This column displays Y (Yes) if the component has been released in this EBOM or N (No) if it is unreleased.
This column displays the date and time the component was released on this EBOM if the Comp Release column is Y. If the component is not released, this field is blank.
This column displays Y (Yes) if the component is a subassembly (that is, its own EBOM) or N (No) if it is not.
If the component is a subassembly (that is, its own EBOM, and the EBOM Exists column is Y), this column displays that EBOM's status: R if the EBOM is released or U if it is unreleased.
These columns display the configuration ID and configuration description for this EBOM. Configuration IDs are established on the Manage Configuration Identifiers screen in Bills of Material. If a configuration ID has not been assigned to this component part's EBOM, these columns will be blank.
This column displays the date on which this component becomes effective in this EBOM.
This column displays the date on which this component ceases to be effective in this EBOM.
This column displays comments that apply to this EBOM component.
This column displays the date of the last engineering change notice for this part. This field is disabled if Engineering Change Notices is being used.
This column displays the percentage (from 0.00 to 999.99) of this component that is expected to be lost when manufacturing this assembly. This value defaults from the Planning Details subtask of the Manage Parts screen (for standard parts) or the Manage Provisional Parts screen (for provisional parts).
This column displays Y (Yes) or N (No) to indicate whether or not the EBOM explosion proceeds to the next lower level of the subassembly.
This column displays Y (Yes) or N (No) to indicate whether or not the quantity requirements of that component are omitted during the EBOM explosion.