Use this screen to enter work center IDs and descriptions used in the Maintain MBOM screen to record when material must be pulled or kitted for a manufacturing order. You can add new lines or change/delete existing lines to maintain work centers. If you have been licensed for Costpoint Routings, you can maintain additional information in the Maintain Work Centers screen in that module.
Set up this screen before creating MBOMs to facilitate manufacturing order processing and maintain as needed.
Enter up to 12 alphanumeric characters in this required field for the new work center ID.
Enter up to 30 alphanumeric characters in this required field to describe the new work center.
Select this checkbox to indicate the work center is active.
Enter, or use Lookup to select, the ID of the organization with which the work center is associated. The organization name displays to the right of the Org Abbrev field.
Enter, or use Lookup to select, the organization abbreviation with which the work center is associated. A default displays in this field if you entered an ID in the Organization field.
Enter the number of employees typically used at the work center.
Enter the number of machines used at the work center.
Enter the ID of the supervisor assigned to the work center.
Use this drop-down box to select the type of process that is performed at the work center. If available, items listed in this drop-down box are maintained in the Process Types screen in Costpoint Routings.
Use this drop-down box to select the work center type. If available, items listed in this drop-down box are maintained in the Work Center Types screen in Costpoint Routings.
Enter, or use Lookup to select, the key resource consumed by the work center. If available, items listed in this drop-down box are maintained in the Resource Types screen in Costpoint Routings.
Enter the date the following rate and capacity data will become effective.
Enter the default hourly labor rate associated with setups in the work center.
Enter the default hourly labor rate associated with manufacturing in the work center.
Enter the target burden rate to be applied to labor dollars in the work center.
Enter the typical hours per week that are available for production, net of efficiency, and utilization. This field may already be populated by the product of the Weekly Gross Hours, Efficiency, and Utilization fields.
Enter the percentage that reflects how well standard hours are met when the work center is operating.
Enter the percentage that reflects how often the work center is operating during shifts.
Enter the typical hours per week that the work center is available for production.
This field displays the total number of daily shifts.
Enter the number of shifts the work center is typically used on a given day.
Select this pushbutton to enter specialized information about the work center.
Select this pushbutton to specify the equipment used in the work center.
Select this pushbutton to specify the labor classifications used in the work center.
Select this pushbutton to specify the maintenance performed on the work center.
Select this pushbutton to specify other work centers that can be used in place of the selected work center.
The WORKCENTER table stores the settings from this screen.