Integration Tab
The Integration tab of the Options dialog box provides you with a convenient way of selecting whether to prefix the Work Package (WP) ID with the Control Account (CA) ID when creating an Integrated Program Management Data and Analysis Report (IPMDAR) file during the Schedule Data Export process.
Note: In the previous version, Open Plan set the IPMDAR export to always prefix the WP ID with the CA ID and used the system preference called UseUniqueWPCostDataProcess to change this setting. For more information, see Standard Open Plan Options.
Related Topics
- Options Dialog Box General Tab
- Symbols Dialog Box
- Options Dialog Box Edit Tab
- Options Dialog Box Project Tab
- Options Dialog Box Views Tab
- Options Dialog Box Codes Tab
- Options Dialog Box Color Tab
- Options Dialog Box Email Tab
- Options Dialog Box Advanced Tab
- Select Standard Views Dialog Box
- System Preferences Defaults Dialog Box
Related Procedures
- Set System Preferences
- Modify the List of Default Views
- Disable Startup Procedures
- Open Last File on Startup
- Show Summary Dates on Subprojects
- Enable Editing of Read-Only Files