Change a Vision Plan to a Vision Navigator Plan
When you are also using the Vision Resource Planning module, you can convert a plan that was originally created in Vision to a Vision Navigator plan. This simplifies data entry, but requires that all subsequent plan updates be made in Navigator. You can then save and publish the plan back to Vision. After you publish, data synchronizes between the two applications and both display the same plan information.
To convert a Vision plan to a Navigator plan, complete the following steps:
- Open a project that has a Vision plan in Vision Navigator and click the Planning tab. The Actions button displays. This button's label changes when there is only one action that can be taken. The button and the associated plan state text change color to indicate the state of the plan. When the project has a Vision plan, the button label changes to Convert and is gray. The plan state text says Vision Plan when the plan is maintained in Vision.
- Click the Convert button to convert the plan. The Convert to a Navigator Plan dialog box displays.
-
Before you convert a Vision plan, review the changes that will occur to ensure there are not any discrepancies with data. When you perform a conversion, the
Synchronize Fees from Plan to Project option (that is set in Vision Plan Settings) does not apply to Vision Navigator Plans. Also, the EV Pct
is set to zero on Vision Navigator Plans.
The following fields are changed during the conversion to align them with Navigator planning.
Vision Location Fields: Field Set To: General tab of Project Planning % Complete Formula - JTD/(JTD + ETC)
- % Complete Cost is recalculated
- % Complete Bill is recalculated
Planned Revenue Fields - Labor Multiplier Type = Planned Ratio
- Reimbursable Method = Billing
Show Unposted Actual Labor Selected Show Committed PO Expenses Selected Available to Other Users Selected Status Changed to match Project Status defined in the Vision Project Info Center. Labor tab of Project Planning Comp, EV Pct, Cons. Fee, Reim. Allow., Comp. Bill, Cons. Bill, Reim. Bill, Total Comp., and Total Comp. Bill fields These amounts are set to zero when converted to a Navigator plan. Rates tab of Project Planning Generic Method, Labor Cost Rates fields, Labor Billing Rates fields, Calculate Consultant Billing Amounts option and fields Navigator Plan Settings fields set to match. Options Menu
Accordion Calendar Format - Starting Day of Week is set to Monday
- Time-phased data is adjusted to show for correct week or bi-weekly view.
Note: The conversion is stopped when:- The Use Billing Currency not Project Currency option is selected in Vision Configuration > Accounting > System Settings, and Plan Billing currency does not equal Project Billing Currency, or Plan Cost currency does not equal Project Cost Currency.
- The Use Billing Currency not Project Currency option is not selected, and the Plan Cost Currency does not equal the Project Cost Currency.
- Consultants are planned at the phase level for phase 1, and the task level at phase 2. Because some consultants are planned at the middle level, and some at the lowest level, you must manually combine them and roll them up to the higher level before converting the plan.
- Click the Convert button convert the plan to a Navigator plan.
- Unmapped Rows in Vision Plans
The Planning grid displays the different levels of a project—the project, phases, and tasks—which are collectively referred to as the Work Breakdown Strucure (WBS). Each WBS element must contain an identifier, which is how the project maps to a plan. - Conditions in Which You Cannot Convert a Vision Plan
There are certain conditions in which you cannot convert a Vision plan to a Navigator plan.