UDT03 Direct and Wildcard Links Subtasks
In stand-alone Time & Expense installations, use the UDT03 Direct and Wildcard Links subtasks of the UDT09 screen to add, edit, or delete UDT03 links.
UDT03 Direct Links Subtask
Linking of an Org ID and Labor Location / Local (link 93) is not supported in co-deployed systems, so the Direct and Wildcard subtasks links do not display
Note: The Direct Link or Wildcard subtasks display conditionally, depending on how link options are set on the UDT options tab of
. For example, if the UDT is configured as a direct link, the subtasks related to Wildcards do not display, or conversely, if configured as Wild Card, the Direct Links subtasks do not display.
Note: If your version of Time & Expense is co-deployed with Costpoint, the Direct Links subtask is read-only, because modifications must be applied directly to the appropriate area within Costpoint.
Field | Description |
---|---|
UDT03 |
This column displays the currently linked UDT03. |
Description |
This column displays the currently linked UDT03 description. |
UDT03 Table Wildcard Links Subtask
Field | Description |
---|---|
UDT09 |
This column displays the currently linked UDT09. |
UDT03 |
This column displays the currently linked wildcard UDT03. |
Description |
This column displays the currently linked UDT03 description. |
Parent Topic: UDT09S