Project Overhead Table Formats (ProjectOverhead)

Follow Vantagepoint specifications for preparing a file containing project overhead data.

Field Name Data Type Length Notes
WBS1 varchar
WBS2 varchar
WBS3 varchar
Period integer Optional. Enter an accounting period here if you want to enter separate overhead amounts for different periods. Leave this field blank if you want to enter a single job-to-date overhead amount for the project or the project/task.

The format for this field is YYYYPP, where YYYY is the 4-digit year and PP is the 2 digit period.

Amount decimal Required. The amount of overhead accumulated by the project or project/task. If the project or project/task has already accumulated overhead, either through the Overhead Allocation utility or through History Loading, Vantagepoint adds the overhead amount entered here to the amount that already exists.
AmountProjectCurrency decimal 9 Multicurrency feature only.