Copy Proposal Bills of Material

Use the Copy Proposal Bills of Material screen to create or overwrite proposal bills of material (PBOMs).

You can copy PBOMs from specified engineering BOMs (EBOMs), manufacturing BOMs (MBOMs), and other PBOMs.

This process supports multi-level BOM copies. For example, select the Proposal (All PBOMs) option as BOM Source to copy all PBOMs for a specified proposal to another proposal for proposal lines with the same end items. If the To PBOM already exists, you can overwrite the existing PBOM with the BOM in the From assembly.

Below is an outline of what is required when copying the BOM source:

BOM Source Requirements (From) Requirements (To)
Engineering BOM From Assembly Part, Rev To Assembly Proposal, Rev

To Assembly Part, Rev

Manufacturing BOM From Assembly Part, Rev To Assembly Proposal, Rev

To Assembly Part, Rev

Proposal BOM From Assembly Proposal, Rev

From Assembly Part, Rev

To Assembly Proposal, Rev

To Assembly Part, Rev

Proposal (All PBOMs) From Assembly Proposal, Rev To Assembly Proposal, Rev
Note:

Before running the application, click the Preview button found on the toolbar to preview the result.

When the copy process is complete and the To Assembly is updated, you must run the Compute Proposal Item Costs application for the proposal to calculate and roll up costs.