MOs Subtask
Use this subtask to view open manufacturing order (MO) detail for a selected inventory record.
Contents
Field | Description |
---|---|
Part |
This field displays the ID of the build part on the selected inventory record. |
Rev |
This field displays the part revision level for the selected inventory record. |
U/M |
This field displays the default or inventory unit of measure for the selected part. |
Description |
This field displays the part description. |
Project |
This field displays the project ID and description associated with the inventory record. |
Project Name |
This field displays the name of the project. |
Table Window
Field | Description |
---|---|
MO |
This field displays the manufacturing order ID. |
MO Type |
This field displays the MO type: Standard, Customer Repair, or Rework. |
MO Status |
This field displays the MO status: Planned, Firm Planned, Released, or In Shop. |
Open Allocated Quantity |
This field displays the quantity of the build part that is yet to be completed and relieved to the build-to inventory abbreviation. This quantity will be zero if an MO is closed, even though it may not have been completed. |
Completed Allocated Quantity |
This field displays the quantity of the build part that has been completed and relieved to the build-to inventory abbreviation. |
Planner |
This field displays the ID of the planner associated with the manufacturing order. |
Supervisor |
This field displays the ID of the supervisor responsible for this manufacturing order. |
Warehouse |
This field displays the warehouse in which the manufacturing order is being built. |
Order Reference |
This field displays the order with which the MO is referenced. |
Order Ref Type |
This field displays the type of order referenced. |
Build Inv Abbrev |
This field displays the manufacturing order allocation inventory abbreviation for the part being built. |
Build Inv Abbrev Name |
This field displays the name of the manufacturing order allocation inventory abbreviation. |
Build Project |
This field displays the project associated with the manufacturing order allocation inventory abbreviation. |
Build Proj Abbrev |
This field displays the project abbreviation of the manufacturing order allocation project. |
Netting Group |
This field displays the netting group associated with the manufacturing order allocation project. |
DPAS Rating | This field displays the DPAS rating from the Build Project of the manufacturing order (MO). |
Order Date |
This field displays the date on which the manufacturing order was created. |
Need Date |
This field displays the actual need date of the manufacturing order. |
Planned Completion Date |
This field displays the date on which the manufacturing order is planned for completion. |
Planned Release Date |
This field displays the date on which the manufacturing order is planned for release. |
Release Date |
This field displays the date on which the manufacturing order was actually released. |
Planned In- Shop Date |
This field displays the date on which the manufacturing order is scheduled to be sent to the shop floor for manufacturing. |
In-Shop Date |
This field displays the date on which the manufacturing order was sent to the shop floor for manufacturing. |
Completion Date |
This field displays the date on which the manufacturing order was completed. |
Issues |
This field displays Y (Yes) or N (No) depending on whether or not material issues have taken place for the manufacturing order. |
Timesheets |
This field displays Y (Yes) or N (No) depending on whether or not timesheet charges have taken place for the manufacturing order. |
Subcontract Charges |
This field displays Y (Yes) or N (No) depending on whether or not subcontract charges have taken place for the manufacturing order. |
Pick List Printed |
This field displays Y (Yes) or N (No) depending on whether or not a pick list has been printed for the manufacturing order. If the MO document package does not include a pick list, NA displays. |
Assembly Sheet Printed |
This field displays Y (Yes) or N (No) depending on whether or not an assembly sheet has been printed for the manufacturing order. If the MO document package does not include an assembly sheet, NA displays. |
Routing Traveler Printed |
This field displays Y (Yes) or N (No) depending on whether or not a routing traveler has been printed for the manufacturing order. If the MO document package does not include a routing traveler, NA displays. |
Component Labels Printed |
This field displays Y (Yes) or N (No) depending on whether or not component labels have been printed for the manufacturing order. If the MO document package does not include component labels, NA displays. |
Configuration List Printed |
This field displays Y (Yes) or N (No) depending on whether or not a configuration list has been printed for the manufacturing order. If the MO document package does not include configuration lists, NA displays. |
Total MO Build Quantity |
This field displays the total build quantity for the manufacturing order. |
Completed Total Quantity |
This field displays the total quantity relieved for the manufacturing order. |
Organization |
This field displays the ID of the organization assigned to the manufacturing order. |
Org Abbrev |
This field displays the abbreviation of the organization ID assigned to the manufacturing order. |
Allow Issues |
This field displays Y (Yes) or N (No) depending on whether or not additional material issues are allowed for the manufacturing order. |
Allow Timesheets |
This field displays Y (Yes) or N (No) depending on whether or not additional timesheet entries are allowed for the manufacturing order. |
Allow Subcontracts |
This field displays Y (Yes) or N (No) depending on whether or not additional subcontracts are allowed for the manufacturing order. |
Configuration |
This field displays the bill of materials configuration to which the build part is being built. Costpoint uses this configuration to determine the BOM components to be used when building this part. This field is unavailable if you did not select the Use Configuration IDs check box in the BOM Corporate Settings block of the Configure Bills of Material Settings screen in Costpoint Bills of Material. |
As-of-Date |
This field displays the date that determines the loading of the selected part's bill of material and operation routings depending on their effectiveness as of the provided date. |
Explosion Levels |
This field displays the specified number of levels of explosion for the bill of material for the selected part used to determine material requirements. |
Reservation |
This field displays the inventory reservation ID for the components/subassemblies requirements generated by the MO process. |
Routing |
This field displays the routing number used by the manufacturing order. Parts can have multiple routings. This number indicates the routing selected for this MO. Routing lines can be modified after they have been copied. |
Rout Desc |
This field displays the routing description. |
Expediting Notes |
This field displays expediting notes associated with the manufacturing order. These notes are entered in the Header subtask of the Manage Manufacturing Orders screen in Costpoint Production Control and do not print with the MO documentation. |
MO Header Notes |
This field displays header notes associated with the manufacturing order. These notes are entered in the Header subtask of the Manage Manufacturing Orders screen in Costpoint Production Control and can be printed with the MO documentation. |
Config Desc |
This field displays the configuration description. |
Subtasks
Subtask | Description |
---|---|
MO Requirements | Click this link to open the MO Requirements subtask to view component/subassembly requirements for a selected manufacturing order. |
MO Routings | Click this link to open the MO Routings subtask to view information on the operations in the routings associated with the manufacturing order. |
- Related Topics:
- MO Requirements Subtask
Use this subtask to view component/subassembly requirements for the selected manufacturing order (MO). - MO Routings Subtask
Use this subtask to view information on the operations in the routings associated with the manufacturing order.