Perform Time Analysis with Current Settings

Use this procedure to perform Time Analysis with the current settings.

Note: If you wish to perform time analysis without displaying the Time Analysis dialog box, you can click Perform Time Analysis on the Processes tab. When you perform time analysis using this method, the settings that were last set on the Time Analysis dialog box control the operation. If you have not entered a Time Now for the project, Open Plan automatically displays the Time Analysis dialog box before allowing you to proceed.

To perform time analysis:

  1. Select the project for which you want to perform time analysis.
  2. From the Processes tab, click Perform Time Analysis.
    Open Plan informs you if an error condition is detected during the session. You can use the Log Viewer to view the contents of the session log.