Manage Projects Base

This base must be used as a child widget from a Project base or on a Project page.

Use this task widget to easily manage your project details such as reported percent complete, reported percent complete date, estimated start date, estimated completion date, actual start date, actual completion date, and notes on your dashboard and have those details updated to the Project Command Center. Any project custom fields from the Project Command Center will also be available. You can also manage a projects attachments with the Actions column.

This base includes additional fields that report project actuals based on activity entered against the project. Actuals are reported at the project, phase, invoice group, and billing group levels. Actuals are not reported at the resource level.

Use the Column Properties to control the editability of the available columns.

Display Options

Enable "% Rollup" button

Enable "Rollup Dates" button

Enable "Show Resources" check box

Required columns

The following are required columns on the Manage Projects widget and cannot be removed.

Columns Description Date Range Available Chartable Editable
Project Key The database identifier of the project      
Invoice Group Key The database identifier of the invoice group associated with the client invoice as defined in > Manage > Project Command Center. If no specific invoice group exists, this column displays Invoice Group.      
Phase Key The database identifier of the phase      
Resource Key The database identifier of the resource      
Project Parent The name of the project parent      
Resource Parent Key

The database identifier of the parent resource

     
Resource Project The name of the resource project      
Is Detail Indicates if the phase is at the level you will enter time and expense to      
Is Billing Phase Indicates whether this phase is a billing group, which groups phases together on an invoice      
Is Resource Indicates whether this is a resource      
Is Task Indicates the resource is a task      
Order

The number that indicates the order of the phase

     
Resource Order

The position of the resource on the Manage tab in the Project Command Center

Example: You may sort the inquiry by resource order so it mirrors the order of the resources on the Manage tab.

     
Phase Level Text that prints on the invoice under the particular phase name      
Resource Level The level the resource appears on the project      
Resource Description The name of the resource      
Work Breakdown Structure The name of the project or phase on the tree structure      
Description Level The description level of the project      

Additional Required Columns

You are required to have ONE of the following columns on the Manage Projects widget.

These fields are editable fields. To ensure a user can edit the below fields,

  1. Click on the column.
  2. In the Properties section for the column, select the Enable Editing check box.
Columns Description Date Range Available Chartable Editable (The column can be edited from the widget)
Reported Percent Complete The RPC or percent of work on the phase that is complete as of the % complete date, as entered on the Manage tab of the project     X
Reported Percent Complete Date The date when you report the percent of work that is complete, as entered on the Manage tab of the project     X
Estimated Start Date The date when work is scheduled to begin, as entered on the Manage tab of the project     X
Estimated Completion Date The date when work is scheduled to be complete, as entered on the Manage tab of the project     X
Notes Any notes entered on the Notes tab of the project     X

Additional Available Columns

The following are the additional columns available to add to the Manage Projects widget.

Available Columns Description Date Range Available Chartable Links to Page Editable (The column can be edited from the widget)
General Information  
Allow Expense and Consultant Entry Indicates if the expense and consultant entries are allowed for the project        
Allow Labor Entry Indicates if labor entries are allowed for the project        
Apply Sales Tax

Indicates if any of the labor or expenses for this project are subject to sales tax

This is defined on the Billing tab of the project.

       
Bill Consultant As TE Indicates if consultant costs for the project are billed as Time & Expense        
Bill Expense As TE Indicates if expenses for the project are billed as Time & Expense        
Bill Labor As TE Indicates if labor on the project is billed as Time & Expense        
Billing Contact Information Information about the billing contact associated with the project     Contact  
Billing Description

The project name, which prints on the invoice

You enter the text on the Invoice subtab of the Project Info tab in the Project Command Center.

       
Billing Rate The billing rate associated with the project        
Billing Type The billing type associated with the project        
Cap WIP Consultant Identifies which Cap WIP method is being used        
Cap WIP Expense Identifies which Cap WIP method is being used        
Cap WIP Labor Identifies which Cap WIP method is being used        
Client The name of the client associated with the project     Client  
Company Name The name of the company associated with the project     Company  
Consultant Invoice Text The consultant invoice text associated with the project        
Contact 1 Information Information about the contact people associated with the project     Contact  
Contact 1 Text

Text about the contact people associated with the project

You enter the text on the Contacts subtab of the Project Info tab in the Project Command Center.

    Contact  
Contact 2 Information Information about the contact people associated with the project     Contact  
Contact 2 Text

Text about the contact people associated with the project

You enter the text on the Contacts subtab of the Project Info tab in the Project Command Center.

    Contact  
Contact 3 Information Information about the contact people associated with the project     Contact  
Contact 3 Text

Text about the contact people associated with the project

You enter the text on the Contacts subtab of the Project Info tab in the Project Command Center.

    Contact  
Contact 4 Information Information about the contact people associated with the project     Contact  
Contact 4 Text

Text about the contact people associated with the project

You enter the text on the Contacts subtab of the Project Info tab in the Project Command Center.

    Contact  
Contact 5 Information Information about the contact people associated with the project     Contact  
Contact 5 Text

Text about the contact people associated with the project

You enter the text on the Contacts subtab of the Project Info tab in the Project Command Center.

    Contact  
Cost Rate The cost rate assigned to the project        
Department Name The name of the department associated with the project     Department  
Description Level The description of the level for the project        
Email Invoice Template The name of the email invoice template selected for the project        
Email Statement Template The name of the email statement template selected for the project        
Expense Invoice Text The expense invoice text associated with the project        
Full Work Breakdown Structure

You can use this column to filter the widget to only include certain phases or resources.

This column works similar to the Work Breakdown Structure column available on the Phase base.

This column includes Invoice Groups.

       
Has Attachments Indicates if the project has attachments        
Invoice Format The invoice format associated with the project        
Invoice Group The name of the invoice group associated with the project        
Is Billing Phase Indicates if the phase is a billing phase        
Is Certified Indicates if the project requires a certified payroll report        
Is Detail Indicates if it is project detail        
Is Resource Indicates if it is a resource        
Is Task Indicates if it is a task        
Is Template Indicates if it is a template        
Labor Invoice Text Labor invoice text entered on the project        
Last Client Invoice The invoice number of the last invoice submitted to the client        
Last Invoice Number Used The last invoice number used on the project        
Location The location of the project        
Notes

Any notes entered on the Notes tab of the project

Note: In the Properties section for the column, ensure the Enable Editing check box is selected.

      X
Order

The position of the phase on the Manage tab in the Project Command Center

       
Phase Description The name of the phase        
Phase ID & Description The ID and description of the phase        
Phase ID The ID of the phase        
Phase Invoice Text Text that prints on the invoice under the particular phase name        
Phase Level Text that prints on the invoice under the particular phase name        
Phase Status

The status of the phase

Examples: Active, Billing Hold, Closed, Hold, Marketing, Preliminary, Work Hold

       
Priority The priority of the task        
Project Description The name of the project     Project  
Project ID & Description The ID and description of the project     Project  
Project ID The ID of the project     Project  
Project Status

The status of the project

Examples: Active, Billing Hold, Hold, Marketing, Preliminary, Work Hold

       
Project Type

The type of project

Examples: Commercial, Educational Facilities, Environmental Planning, Interiors, Medical Facilities, Residential

    Project Type  
Rate Table The billing rate table associated with the project        
Reference A short description that further identifies the resource        
Resource Level Indicates the level of the resource        
Resource Order

The position of the resource on the Manage tab in the Project Command Center

Example: You may sort the inquiry by resource order so it mirrors the order of the resources on the Manage tab.

       
Resource Type Indicates the type of resource (expense or consultant)        
Revenue Method Consultant The revenue method assigned for consultants on the project        
Revenue Method Expense The revenue method assigned for expenses on the project        
Revenue Method Labor The revenue method assigned for labor on the project        
Sales Tax Code The sales tax applied to the project        
Summarize Billing Phase Indicates whether the phases of a project or billing group are set to summarize (subtotal) on an invoice        
Wage Table The name of the wage table used for the project        
Work Breakdown Structure

 

This column includes Invoice Groups.

       
People  
Billing Contact Name The name of the billing contact associated with the project     Contact  
Billing Manager The billing manager associated with the project     Employee  
Contact 1 Name Information about the contact people associated with the project     Contact  
Contact 2 Name Information about the contact people associated with the project     Contact  
Contact 3 Name Information about the contact people associated with the project     Contact  
Contact 4 Name Information about the contact people associated with the project     Contact  
Contact 5 Name Information about the contact people associated with the project     Contact  
Marketing Contact The name of the marketing contact associated with the project        
Principal In Charge The name of the principal associated with the project     Project Manager  
Project Manager The name of the project manager associated with the project     Project Manager  
Resource Description The description or name of the resource        
Resource This displays Employee Name if vec = Employee and Vendor Name if vec = Vendor.        
Vendor The name of the vendor        
Dates  
Actual Completion Date

The actual date when work is complete.

This column can be edited from the widget.

Note: In the Properties section for the column, ensure the Enable Editing check box is selected.

      X
Actual Start Date

The actual date when work begins.

This column can be edited from the widget.

Note: In the Properties section for the column, ensure the Enable Editing check box is selected.

      X
End Date The date the work is scheduled to be completed        
Estimated Completion Date

The date when work is scheduled to be complete, as entered on the Manage tab of the project

Note: In the Properties section for the column, ensure the Enable Editing check box is selected.

      X
Estimated Start Date

The date when work is scheduled to begin, as entered on the Manage tab of the project

Note: In the Properties section for the column, ensure the Enable Editing check box is selected.

      X
Last Invoice Date The last invoice date associated with the project        
Last Receipt Date The last receipt date associated with the project        
Next Task Date The date of the next task associated with the project        
Reported Percent Complete Date

The date when you report the percent of work that is complete, as entered on the Manage tab of the project

Note: In the Properties section for the column, ensure the Enable Editing check box is selected.

X     X
Start Date The date the work is scheduled to start        
Hours/Units  
Billed Hours The total number of hours billed to the client associated with the project X X    
Hours Worked The total number of hours worked on the project X X    
Premium 1 Hours Worked The total number of premium 1 hours worked on the project X X    
Premium 2 Hours Worked The total number of premium 2 hours worked on the project X X    
Premium 3 Hours Worked The total number of premium 3 hours worked on the project X X    
Regular Hours Worked The total number of regular hours worked on the project X X    
Resource Hours The total number of hours entered by resources (that is, employees) assigned to the project   X    
Scheduled Hours The number of hours in the future scheduled for the project in the Schedule Manager X X    
Unit Description

Only appears if the phase has a billing type of Unit Price.

This is the name of the unit, which prints on the invoice.

       
Unit Rate The price of each unit        
Units The number of units required to complete the phase        
Units/Hours The number of hours or units required to complete the transaction        
WIP Hours The total number of work-in-progress (WIP)hours associated with the project X X    
Written off Hours The total number of write-off hours associated with the project X X    
Dollar  
Beginning Balance Revenue Consultant The amount entered in the Revenue over/-under field for Consultant in the Project Command Center > Beginning Balance subtab        
Beginning Balance Revenue Expense The amount entered in the Revenue over/-under field for Expense in the Project Command Center > Beginning Balance subtab        
Beginning Balance Revenue Labor The amount entered in the Revenue over/-under field for Labor in the Project Command Center > Beginning Balance subtab        
Beginning Balance Revenue Total The total amount entered in the Revenue over/-under field for Consultant, Expense, and Labor in the Project Command Center > Beginning Balance subtab        
Billed Adjustments Consultant The amount of adjustments with an activity type of Consultant that were billed X X    
Billed Adjustments Expense The amount of adjustments with an activity type of Expense that were billed X X    
Billed Adjustments Labor The amount of adjustments with an activity type of Labor that were billed X X    
Billed Adjustments The amount of any adjustments that were billed X X    
Billed Amount By Accounting Date The total amount billed to the client as of the accounting date X      
Billed Consultant The amount of consultant costs billed to the client associated with the project X X    
Billed Expense The amount of expenses billed to the client associated with the project X X    
Billed Labor The amount of labor billed to the client associated with the project X X    
Billed Sales Tax The total amount of sales tax billed to the client associated with the project X X    
Billed The total amount billed to the client associated with the project X X    
Consultant Billed by Accounting Date The amount of consultant costs billed to the client as of the accounting date X      
Consultant Contract Amount

The amount negotiated to be invoiced for consultant work performed on the project

Does not apply to Nonbillable, Marketing, or Overhead billing types

  X    
Consultant Cost Budget The amount budgeted for consultants for the project   X    
Consultant Markup Rate

An increase to the consultant cost by a specified percentage to reflect overhead and DPE costs

It is used for project reporting to calculate profit based on the real cost of consultants for the project.

       
Cost + Premium Burdened The cost amount of the project + the premium cost + the overhead amount X X    
Cost + Premium

The cost amount of the project + the premium cost

This does not include any markups.

X X    
Cost Burdened The cost amount of the project + the overhead amount X X    
Cost Consultant The cost amount of the consultants for the project X X    
Cost Expense The cost amount of the expenses for the project X X    
Cost Labor + Premium Burdened The labor cost amount of the project + the overhead amount of the premium time X X    
Cost Labor + Premium

The cost amount of the phase + the premium cost

This does not include any markups.

X X    
Cost Labor Burdened The cost amount of the labor for the project + the overhead amount X X    
Cost Labor The cost amount of the labor for the project X X    
Cost

The cost amount of the project

This does not include any markups.

X X    
Expense Billed by Accounting Date The amount of expenses billed to the client as of the accounting date X      
Expense Contract Amount

The amount negotiated to be invoiced for expenses incurred on the project

Does not apply to Nonbillable, Marketing, or Overhead billing types

  X    
Expense Cost Budget The amount budgeted for expenses for the project   X    
Expense Markup Rate

An increase to the expense cost by a specified percentage to reflect overhead and DPE costs

It is used for project reporting to calculate profit based on the real cost of expenses for the project.

       
Labor Billed by Accounting Date The amount of labor billed to the client as of the accounting date X      
Labor Contract Amount

The amount negotiated to be invoiced for labor performed on the project, as entered on the Manage tab of the project

Does not apply to Nonbillable, Marketing, or Overhead billing types

  X    
Labor Cost Budget The amount budgeted for labor for the project   X    
Labor Cost Rate

The average hourly rate that reflects the actual cost of labor for the project without overhead and DPE costs. This is the average per hour rate paid to an employee.

This rate is set up in company preferences, and is used to calculate cost budgets when you enter budgeted hours with no employee or employee type

       
Labor Fee Rate

The average hourly rate that reflects the rate you use to calculate contract amounts for budgeted hours

Ajera uses this rate to calculate fee budgets when you enter budgeted hours with no employee or employee type.

       
Payable Balance The total amount remaining to be paid to the vendors associated with the project X X    
Payments Consultant The amount paid to vendors for consultant costs X X    
Payments Expense The amount paid to vendors for expenses X X    
Payments The total amount paid to vendors associated with the project X X    
Payroll Cost Burdened w/Exp & Cons

The payroll cost of labor for the project with overhead and DPE costs included, plus expenses and consultants

Payroll cost is the total sum of money to be paid out to employees at a given time

X X    
Payroll Cost Labor Burdened

The payroll cost of labor for the project with overhead and DPE costs included

Payroll cost is the total sum of money to be paid out to employees at a given time.

X X    
Payroll Cost Labor

The payroll cost of labor for the project without overhead and DPE costs

Payroll cost is the total sum of money to be paid out to employees at a given time

X X    
Payroll Cost w/Exp & Cons

The payroll cost of labor for the project without overhead and DPE costs, plus expenses and consultants

Payroll cost is the total sum of money to be paid out to employees at a given time.

X X    
Premium Cost The cost amount of representing the increase to the employee's pay to reflect pay for hours entered as premium time (such as overtime and double time) X X    
Receipts Adjustments Consultant The amount of client receipts entered for adjustments with an activity type of Consultant X X    
Receipts Adjustments Expense The amount of client receipts entered for adjustments with an activity type of Expense X X    
Receipts Adjustments Labor The amount of client receipts entered for adjustments with an activity type of Labor X X    
Receipts Adjustments The amount of client receipts entered for adjustments, such as a discount X X    
Receipts Consultant The amount of client receipts entered for consultants X X    
Receipts Credit Memo Consultant The amount of credit memos entered for consultants        
Receipts Credit Memo Expense The amount of credit memos entered for expenses        
Receipts Credit Memo Labor The amount of credit memos entered for labor        
Receipts Credit Memo The amount of credit memos entered for the project        
Receipts Expense The amount of client receipts entered for expenses X X    
Receipts Labor The amount of client receipts entered for labor X X    
Receipts Sales Tax The amount of client receipts entered for sales tax X X    
Receipts The total amount of client receipts entered for the project X X    
Receivable Balance The receivable balance for the project X X    
Recognized Revenue Consultant The amount of recognized revenue for consultants        
Recognized Revenue Expense The amount of recognized revenue for expenses        
Recognized Revenue Labor The amount of recognized revenue for labor        
Recognized Revenue Total The total amount of recognized revenue        
Reported Percent Complete

The RPC or percent of work that is complete as of the % complete date, as entered on the Manage tab of the project

Note: In the Properties section for the column, ensure the Enable Editing check box is selected.

X X   X
Resource Cost The total of the resources (that is, employees) assigned to the project   X    
Resource Fee The total of the resources (that is, employees) assigned to the project plus overhead and DPE costs   X    
Revenue Consultant The total of the consultant revenue recognized for the project X X    
Revenue Expense The total of the expense revenue recognized for the project X X    
Revenue Labor The total of the labor revenue recognized for the project X X    
Revenue Total The total of the revenue recognized for the project X X    
Sales Tax Rate The sales tax, as a percent, applied to the project   X    
Scheduled Dollars

The amount scheduled to date in Schedule Manager

Ajera calculates the amount by multiplying the scheduled hours by the billing rate

X X    
Spent Consultant The amount of consultant work performed on the project at the billing rates X X    
Spent Expense The amount of expenses incurred on the project at the billing rates X X    
Spent Labor The amount of labor performed on the project at the billing rates X X    
Spent The total amount of time and expense spent on the project at the billing rates X X    
Total Contract Amount The total amount of the contract associated with the project (includes expenses and consultants, if selected)   X    
Total Cost Budget The total cost budget amount for the project   X    
Uncommitted Revenue Consultant

The amount of uncommitted consultant revenue associated with the project/phase

X X    
Uncommitted Revenue Expense The amount of uncommitted expense revenue associated with the project/phase X X    
Uncommitted Revenue Labor The amount of uncommitted labor revenue associated with the project/phase X X    
Uncommitted Revenue Total The total amount of uncommitted revenue associated with the project/phase X X    
Vendor Invoiced Consultant The amount of vendor invoices for consultants X X    
Vendor Invoiced Expense The amount of vendor invoices for expenses X X    
Vendor Invoiced The total amount of vendor invoices associated with the project X X    
WIP Consultant The amount of work-in-progress (WIP) for consultant costs X X    
WIP Expense The amount of work-in-progress (WIP) for expenses X X    
WIP Labor The amount of work-in-progress (WIP) for labor X X    
WIP The total amount of work-in-progress associated with the project X X    
Written off Consultant The amount of write-off for consultant costs X X    
Written off Expense The amount of write-off for expenses X X    
Written off Labor The amount of write-off for labor X X    
Written off The total amount of write-off associated with the project X X    
Keys  
Billing Contact Key The database identifier of the billing contact associated with the project     Contact  
Billing Manager Key The database identifier of the billing manager associated with the project     Employee  
Client Key The database identifier of the client associated with the project     Client  
Company Key The database identifier of the company associated with the project     Company  
Contact 1 Key The database identifiers of the contact people associated with the project     Contact  
Contact 2 Key The database identifiers of the contact people associated with the project     Contact  
Contact 3 Key The database identifiers of the contact people associated with the project     Contact  
Contact 4 Key The database identifiers of the contact people associated with the project     Contact  
Contact 5 Key The database identifiers of the contact people associated with the project     Contact  
Department Key The database identifier of the department associated with the project     Department  
Invoice Group Key The database identifier of the invoice group associated with the client invoice as defined in > Manage > Project Command Center. If no specific invoice group exists, this column displays Invoice Group.        
Manage Projects Key The database identifier for manage projects        
Marketing Contact Key The database identifier of the marketing contact associated with the project     Employee  
Phase Key The database identifier of the phase        
Principal In Charge Key The database identifier of the principal associated with the project     Project Manager  
Project Key The database identifier of the project     Project  
Project Manager Key The database identifier of the project manager associated with the project     Project Manager  
Project Parent The database identifier of the project parent        
Project Type Key The database identifier of the project type associated with the project     Project Type  
Resource Employee Key The database identifier of the resource employee        
Resource Key The database identifier of the resource        
Resource Parent Key The database identifier of the resource parent        
Resource Project The database identifier of the resource project        
Resource Type Key The database identifier of the resource type        
Vendor Key The database identifier of the vendor        
Action  
Action Menu Use the Action menu to view or add attachments and open the Project Command Center for viewing/editing the project        

 

 

© 2024 Deltek Inc. All rights reserved.