Primavera P6 Has Trouble Connecting to the Database

The Primavera P6 Integration queue is a dedicated queue that processes the P6 integration jobs. The number of concurrent processes is set to 5 by default and that is the recommended maximum. If you experience connectivity issues with P6 integration processes, you may want to reduce this to a lower number.

The servers that pick up the P6 Integration queue jobs must be able to connect to the P6 server's URL for web services, which is: http://<servername>:8206/p6ws. See the Integrating with Primavera P6 appendix in the Deltek PM Compass Installation Guide for prerequisite and configuration information.

For more information about the P6 Integration Queue, see P6 Integration Queue.