Use this reference to learn about the level of specification (LOS)-associated content that
Specpoint automatically includes in a given
family based on your project's baseline LOS.
Navigate to the following contents:
Part 1 General
| Number
|
Article
|
LOS
|
| 1.1
|
Summary
|
100
|
| 1.2
|
Allowances
|
350
|
| 1.3
|
Unit Prices
|
350
|
| 1.4
|
Alternates
|
350
|
| 1.5
|
Definitions
|
350
|
| 1.6
|
Preinstallation Meetings
|
300
|
| 1.7
|
Action Submittals
|
300
|
| 1.8
|
Information Submittals
|
300
|
| 1.9
|
Closeout Submittals
|
300
|
| 1.10
|
Maintenance Material Submittals
|
300
|
| 1.11
|
Quality Assurance
|
300
|
| 1.12
|
Mockups
|
300
|
| 1.13
|
Preconstruction Testing
|
300
|
| 1.14
|
Delivery, Storage, and Handling
|
350
|
| 1.15
|
Field Conditions
|
300
|
| 1.16
|
Warranty
|
300
|
Part 2 Products
| Number
|
Article
|
LOS
|
| 2.1
|
{Insert Product Type}
|
100
|
| 2.2
|
Performance Requirements
|
200
|
| 2.3
|
Description of Assembly
|
200
|
| 2.3
|
System Description
|
200
|
| 2.4
|
{Significant Item of Work}
|
300
|
| 2.5
|
{Components}
|
200
|
| 2.6
|
Accessories
|
300
|
| 2.7
|
Materials
|
300
|
| Any article with the term "Materials" or "Tolerances" has an LOS of 300
|
300
|
| 2.8
|
Fabrication {of {Insert Product/Work Result}}
|
200
|
| 2.9
|
General Finish Requirements
|
200
|
| 2.10
|
Finishes
|
300
|
| 2.11
|
Source Quality Control
|
300
|
| Any article with the term "General" or "Assembly" has an LOS of 200
|
200
|
Part 3 Execution
| Number
|
Article
|
LOS
|
| 3.1
|
Examination
|
350
|
| 3.2
|
Preparation
|
350
|
| 3.3
|
{Installation} {Application} {Erection} {of {Insert each Product Type}}
|
300
|
| 3.4
|
{Installation} {Erection} Tolerances
|
300
|
| 3.5
|
Repair
|
350
|
| 3.6
|
System Startup
|
300
|
| 3.7
|
Field Quality Control
|
300
|
| 3.8
|
Adjusting
|
350
|
| 3.9
|
Cleaning
|
350
|
| 3.10
|
Protection
|
350
|
| 3.11
|
Maintenance Service
|
300
|
| 3.12
|
Software Service Agreement
|
350
|
| 3.13
|
Demonstration
|
300
|
| 3.14
|
{Insert Product} {Schedule} {Application}
|
300
|