Why Would I Want to Use the Top Level Work Force?
Select the Use Top Level Work Force checkbox if the rates that are used on the project are the same set of rates regardless of the level of the project where they are charged.
The Use Top Level Work Force checkbox tells Costpoint to default and validate PLCs from the top level of the project only. Normally, Costpoint validates and defaults PLCs from the transaction level of the project. The Use Top Level Work Force checkbox is available only at the top level of the project.
Parent Topic: Basic Info Tab FAQs