Bills of Material
- Related Topics:
- Manage Manufacturing Bills of Material
Use this screen to set up and maintain the hierarchical relationship of parts in a production environment. - Release Manufacturing Bills of Material
Use this screen to release manufacturing bills of materials (MBOMs) that have been set up in the Manage Manufacturing Bills of Material screen and to modify existing MBOMs. - Release Multiple Manufacturing Bills of Material
Use this screen to selectively release multiple manufacturing bills of materials (MBOMs). - Manage Engineering Bills of Material
Use this screen to establish and maintain the hierarchical relationship of parts in an engineering design environment. - Release Engineering Bills of Material
Use this screen to release engineering bills of material (EBOMs) that have been set up in the Manage Engineering Bills of Material screen. - Release Multiple Engineering Bills of Material
Use this screen to selectively release multiple engineering bills of material (EBOMs). - Manage End Item Configurations
Use this screen to load information about end items, their serial numbers, and the configurations that will be used to build them. - Copy Bills of Material
Use this screen to copy bills of material records in the following functions: - Apply Mass Component Changes to Bills of Material
Use this screen to replace all instances of one component (or subassembly) with another throughout an entire manufacturing bill of material (MBOM) or engineering bill of material (EBOM). - Compute Costed Bills of Material
Use this screen to print an indented or single-level costed bill of material (BOM) for a selected range of assembly part numbers.
Parent Topic: Bills of Material