Convert Project Number Formats
To reformat the length, delimiter, or delimiter position for your project numbers, use the Key Format utility for project numbers.
If you are making a key format project number change for a project that is synced to PIM, make sure to verify your PIM connection first. On the Setup tab in Enable Sync to PIM and the relevant Projects hub and charge type checkboxes. When you finish, click Test Connection to verify that you can connect from Vantagepoint to PIM. Otherwise, the key format project number change does not sync to PIM.
, you must select theWhen you install Vantagepoint, the default work breakdown structure (WBS) has only the project level (WBS 1 level). Use this utility to change the default settings for that level to meet the needs of your enterprise.
If you want to have the option to use the phase level (WBS 2 level) or the phase and task levels (WBS 2 and 3 levels, use the key format conversion utilities for phases and tasks to specify the format information for those levels.
If your company has an on-premises deployment of Vantagepoint, your company manages your database backup. If your company has a cloud-based deployment of Vantagepoint, coordinate with Deltek about your database backup.
To reformat project numbers:
When you run this utility, the sync between Vantagepoint and PIM is maintained. The utility changes both the project number in Vantagepoint and the corresponding project number in PIM.
For more information, see After You Implement PIM Integration.