Add a Time Analysis Column

You manage user-defined Time Analysis columns on the Report Columns grid of the Time Analysis report. These columns appear as column headings on the Time Analysis report.

Only overhead and promotional projects can be assigned to the report column headings on the Time Analysis report. Any indirect project not assigned to a report column prints in the Other column on the report.

To add a column heading to the Time Analysis report:

  1. In the Navigation pane, select Settings > Accounting > Time Analysis.
  2. Below the Report Columns grid on the Time Analysis settings form, click +Add Time Analysis Report Column.
  3. In the blank field that displays, enter the name of the Time Analysis Report column for which you want to include amounts posted to this project (or range of projects).
    For example, you could have amounts for project 0000002.00, Vacation, display in the Vacation column of the Time Analysis report.
  4. To exclude a column, such as Vacation or Sick Leave, from the time analysis ratio calculations, select the Absence check box for that column.
  5. Click Save.
Postrequisites: Define the type of information that you want to analyze and define the projects associated with each of those columns. See Add Time Analysis Projects.