Project Planning Schedule Report

The Project Planning Schedule report displays project plan schedules, based on the work breakdown structure (WBS) levels in the plan.

Your selection in Maximum Task Level on the Options tab determines the level of detail the report displays. You can display a Gantt chart for each plan.

Available WBS Levels

The number of project planning levels available and reflected in this report depends upon which project work breakdown structure (WBS) levels Vantagepoint is set up to use and whether Vantagepoint is set up to use labor codes. If Vantagepoint is set up to use all three project WBS levels and to use labor codes, you can show up to four planning levels on this report.