Project Planning Schedule Report
The Project Planning Schedule report displays project plan schedules, based on the work breakdown structure (WBS) levels in the plan.
Your selection in Maximum Task Level on the Options tab determines the level of detail the report displays. You can display a Gantt chart for each plan.
Available WBS Levels
The number of project planning levels available and reflected in this report depends upon which project work breakdown structure (WBS) levels Vantagepoint is set up to use and whether Vantagepoint is set up to use labor codes. If Vantagepoint is set up to use all three project WBS levels and to use labor codes, you can show up to four planning levels on this report.
- Related Topics:
- Project Planning Schedule Groups Tab
Use the Groups tab to select and save options for organizing data on your report. - Project Planning Schedule Options Tab
Use the Options tab to indicate if you want to include Gantt charts for plans, and limit the tasks and resources included. - Project Planning Schedule Layout Tab
Use the Layout tab to choose the formatting properties and visual characteristics to be displayed on your report. - Columns for Project Planning Schedule Report
The following columns are available for this report.
Parent Topic: Resource Planning Reports