Subtasks of Release Engineering Bills of Material
The Release Engineering Bills of Material screen has the following subtasks: Configuration, Assembly Serial Numbers, Part Documents, Clone EBOM Lines, Create Provisional Part, Reference Designators, Component Text, Alternate Parts, Substitute Parts, Part Documents, and Create Provisional Part.
- Related Topics:
- Configuration Subtask
Use this subtask to assign a configuration ID to the selected assembly part in the Manage Engineering Bills Of Material screen. - Assembly Serial Numbers Subtask
Use this subtask to view all serial numbers associated with the selected assembly part in the Manage Engineering Bills of Material screen. These serial numbers are based on the configuration ID assigned to that assembly part. - Part Documents Subtask
This subtask displays a list of the documents that are assigned to the selected assembly part on the Manage Engineering Bills of Material screen. - Clone EBOM Lines Subtask
Use this subtask to clone engineering bills of material (EBOM) lines for this an existing assembly part. - Reference Designators Subtask
Use this subtask to assign reference text to the selected component line. If you selected the Use Extended Length Reference Designators check box in the Configure Bills of Material Settings screen, you can enter up to 32,000 characters. If the check box is not selected, the standard 254-character length applies. - Component Text Subtask
Use this subtask to attach standard text notes to the selected component in the Manage Engineering Bills of Material screen. You can do this manually or by clicking Autoload. - Alternate Parts Subtask
Use this subtask to view the list of alternate parts for the selected component in the Manage Engineering Bills of Material screen. - Substitute Parts Subtask
Use this subtask to view the substitute parts information for a selected component part in the Manage Engineering Bills of Material screen. - Part Documents Subtask
This subtask displays a list of the documents that are assigned to the selected component part in the Manage Engineering Bills of Material screen. - Create Provisional Part Subtask
Use this subtask to enter provisional part data "on the fly" when you manually enter a component part that does not exist in Costpoint.
Parent Topic: Release Engineering Bills of Material