Schedule A — Summary of Claimed Indirect Expense Rates

Schedule A is a summary of all the contractor’s indirect rates.

The pools and bases in Schedule A are linked to their respective schedules as shown in this table.

Note: Schedule A uses the standard Costpoint pool types. If your company has modified these defaults, you must modify the report accordingly.

Function

From Schedule

Overhead

Schedule C

Occupancy

Schedule D

G&A

Schedule B

Claimed Allocation Bases

Schedule E