Manage Employee Work Force

Use this screen to enter a set of employees who are designated to charge the project.

This "set," or work force, can be used for validations during timesheet entry, so that only those employees entered on the project work force can charge the project. It can also be used to designate specific PLCs for anyone who does work on the project.

Using the Project Work Force to default PLCs onto the timesheet can greatly expedite the timesheet entry process. Generally, a Project Work Force is necessary when a customer places a limitation on who can charge the project or when the project has specific Labor Category billing rates that must be used.

If you selected the Project Work Force Required checkbox on the Basic Info tab of the Manage Project User Flow, you must enter a Project Work Force; it is used for validations during timesheet entry. If you did not select the Project Work Force Required checkbox, entry of a Project Work Force is optional. In this case, no validation of the workforce occurs during timesheet entry. You can still assign special PLCs to the project work force for tracking or billing purposes, even if no Timesheet validation is required.

If you selected the Use Top Level Work Force checkbox on the Basic Info tab of the Manage Project User Flow, you can set up the project work force in this screen at the top level and it is effective for the entire project tree. If you did not select the Use Top Level Work Force checkbox, you must set up the project work force at each charging level.

Note: Deltek Time & Expense users — In previous versions of Costpoint, if you deleted a record in this screen, you had to perform a full download from Costpoint to move the modifications into Time & Expense. Starting with Costpoint version 6, you can move the modifications into Time & Expense by executing the Export Data to Deltek Time & Expense application with the Changes Since Last Download checkbox selected. The modifications are included in the export file as D record types. You do not need to perform a full download.

Use this screen to initialize a project whenever the Project Work Force Required checkbox on the Basic Info tab is selected or when you would like to use the Project Workforce to default PLCs. After initialization, maintenance of the data on this screen is required only for modifications/additions to the work force.