Contents of the Print Master Production Schedule Action Message Report Screen

Use the fields and options to configure the Print Master Production Schedule Action Message Report screen.

Identification

Use the fields in this block to create a new parameter ID or to retrieve a previously saved parameter ID. A parameter ID represents a set of screen selection parameters. After you have saved a parameter ID and its related parameters, you can retrieve them using Query.

You can use the retrieved parameters to produce reports and run processes more efficiently and with greater consistency. The saved parameters are also useful and necessary when you want to run the process as part of a batch job. Many users save a unique set of parameters for each different way they run a report or process. When you select a previously saved parameter ID or parameter description, the associated saved screen selection parameters automatically display as selection defaults. The page setup and print options, if there are any, are also included in the saved parameter ID. You can change any of the associated selection defaults as necessary.

Field Description
Parameter ID

Enter, or click to select, a parameter ID of up to 15 alphanumeric characters. Choose characters for your parameter ID that help identify the type of selections you made on the screen, such as PERIOD or QUARTERLY.

When you save your record, all the selections made on the screen are stored with the parameter ID. Later, you can retrieve the parameter using Query.

You can use the parameter to run the process more efficiently because you can select the parameter ID with its previously defined screen selections. After the default selections display on the screen, you can override the defaults.

Description

Enter, or click to select, a parameter description of up to 30 alphanumeric characters.

Selection Ranges

MPS Plan

Field Description
Options

This field always displays One.

Start

Enter, or click to select, the planning code for the action messages you want to view. Enter P for the  official MPS Production plan or select the code for a what-if  plan.

Part/Rev

Use this group box to select the part/revision whose action messages you would like to include in the report.

Your selections here do not affect how Overcapacity messages are selected.

Field Description
Options

Use the drop-down list to select the range of parts/revisions to include in the report. Available options are:

  • All
  • One
  • Range
  • From Beginning
  • To End

This field defaults to All.

Start

Enter, or click to select, the part/revision (or beginning part/revision in a range) for which you would like to view messages. The revision displays if you selected the Allow Multiple Revisions for Each Item check box on the Corporate Settings block of the Configure Product Definition Settings screen. If you select All or  From Beginning in the Options field, this field is not available.

End

Enter, or click to select, the ending part/revision (in a range) for which you would like to view messages. The revision displays if you selected the Allow Multiple Revisions for Each Item check box on the Corporate Settings block of the Configure Product Definition Settings screen. If you select All, One, or To End in the Options field, this field is not available.

Planner

Use this group box to select the planners whose action messages that you would like to include in the report. Your selections here do not affect how ECN Pending or Overcapacity  messages are selected.

Field Description
Options

Use the drop-down list to select the range of planners to include in the report. Available options are:

  • All
  • One
  • Range
  • From Beginning
  • To End

The default is All. If you select All, the report also includes action messages without a planner.

Start

Enter, or click to select, the planner (or beginning planner for a range) whose messages you would like to view. If you select All or From Beginning in the Options field, this field is not available.

End

Enter, or click to select, the ending planner (for a range) whose messages you would like to view. If you select  All, One, or To End in the Options field, this field is not available.

Warehouse

Use this group box to select the action messages by warehouse that you would like to include in the report.

Your selections here do not affect how Overcapacity and ECN Pending messages are selected.

Field Description
Options

Use the drop-down list to select the range of warehouses to include in the report. Available options are:

  • All
  • One
  • Range
  • From Beginning
  • To End

This field defaults to All and is disabled if you did not select the Plan Warehouse Separately check box on the Corporate Settings block of the Configure Material Requirements Planning Settings screen. It defaults to One and is enabled if you selected the Plan Warehouse Separately check box.

Start

Enter, or click to select, the warehouse (or beginning warehouse for a range) that you would like to include in the report. If you select All or From Beginning in the Options field, this field is not available.

End

Enter, or click to select, the ending warehouse (for a range) that you would like to include in the report. If you select All, One, or To End in the Options field, this field is not available.

Buyer

Use the fields in this group box to select the buyer whose action messages you would like to include in the report.

Field Description
Options

Use the drop-down list to select the range of buyers to include in the report. Available options are:

  • All
  • One
  • Range
  • From Beginning
  • To End

This field defaults to All, in which case it includes the action messages for all buyers, along with messages without a buyer.

Start

Enter, or click to select, the buyer (or beginning buyer for a range) whose messages you would like to view. If you select All or From Beginning in the Options field, this field is not available.

End

Enter, or click  to select, the ending buyer (for a range) whose messages you would like to view. If you select All, One, or To End in the Options field, this field is not available.

Planned Order Date Cutoff

Field Description
Options

This field always displays From Beginning.

End

Enter, or click to select, the last suggested order date for which you would like to view planned order action messages.

Project

Use this selection option to select the projects whose action messages you would like to include in the report. Your selections here do not affect how  ECN Pending or Overcapacity messages are selected.

Field Description
Options

From the drop-down list, select the range of projects to include in the report. Available options are:

  • All
  • One
  • Range
  • From Beginning
  • To End
Start

Enter, or click to select, the project (or beginning project for a range). If you select All or From Beginning in the Options field, this field is not available.

End

Enter, or click to select, the ending project (for a range). If you select All,   One, or To End in the Options field, this field is not available.

Netting Group

Some inventory projects are assigned are a netting group. A netting group is a user-defined collection of projects that is planned together by MRP/MPS.

Use this selection option to select the projects, by netting group, whose action messages you would like to include in the report.

Your selections here do not affect how ECN Pending or Overcapacity  messages are selected.

Field Description
Options

From the drop-down list, select the range of netting groups to include in the report. Available options are:

  • All
  • One
  • Range
  • From Beginning
  • To End

If you select All,  the report also includes action messages for projects without netting groups.

Start

Enter, or click to select, the netting group (or beginning netting group for a range) whose messages you would like to view. If you select All or From Beginning in the Options field, this field is not available.

End

Enter, or click to select, the ending netting group (for a range) whose messages you would like to view. If you select All, One, or To End in the Options field, this field is not available.

Key Resource

Use the fields in this group box to select the Overcapacity action messages by key resource that you would like to include in the report.

Your selections here affect only how Overcapacity messages are selected.

Field Description
Options

Use the drop-down list to select the range of key resources to include in the report. Available options are:

  • All
  • One
  • Range
  • From Beginning
  • To End

This field defaults to All.

Start

Enter, or click to select, the key resource (or beginning key resource for a range) that you would like to include in the report. If you select All or From Beginning in the Options field, this field is not available.

To

Enter, or click to select, the ending key resource (for a range) that you would like to include in the report. If you select All, One, or To End in the Options field, this field is not available.

Sort By

Field Description
1st Sort

Select the sort criteria from the drop-down list. Valid options are:

  • Netting Group/Project: If you select this option, messages sort by the message project's netting group, then by project, and then by part.
  • Message Type: If you select this option, messages sort by message type, and then by part.
  • Supply Order Type: If you select this option, the messages sort by the type of order (for example, purchase requisition, PO, manufacturing order) and then by part.
  • Commodity: If you select this option, the messages sort first by the action message part's commodity code, then by part.
2nd Sort

The only second sort currently available is Part.

Options

Include Message Types

Use the options in this group box to select the types of messages to include in the report. At least one message type must be selected to run the report.

Field Description
Planned Order

Select this check box to include planned order action messages in the report.

Reschedule Order

Select this check box to include reschedule order action messages in the report.

Decrease Qty

Select this check box to include decrease order quantity action messages in the report.

Cancel Order

Select this check box to include cancel order action messages in the report.

Planned Order within Time Fence

Select this check box to include action messages triggered when the planned order has been created to meet unfulfilled demand requirements and the suggested due date is within the calculated MPS time fence range for this part.

Reschedule Order within Time Fence

Select this check box to include action messages triggered when a reschedule order message has been created to adjust a firmed orders due date and the suggested due date is within the calculated MPS time fence range for this part.

Exceeds Maximum Lot Quantity

Select this check box to include action messages indicating that the order/requisition quantity on the supply order referenced exceeds the maximum lot size quantity for this part, as defined on the Manage Parts screen in Product Definition.

GFM Planned Order

Select this check box to include Government Furnished Materials (GFM) planned order action messages in the report.

Inactive Inventory

Select this check box to include inactive inventory abbreviation planned order action messages in the report.

ECN Pending

Select this check box to include action messages indicating that there is an Engineering Change Notice (ECN) outstanding against an MPS part. You must select either Message Type or  Commodity as your 1st Sort if you want to include messages of this type.

Overcapacity

Select this check box to include action messages indicating that a key resource is identified as  overcapacity  during a production week.

Include Supply Order Types

Use the options in this group box to select the supply order types to include in the report. These options do not affect whether or not ECN Pending or Overcapacity messages are selected.

Field Description
Purchase Requisitions

Select this check box to include messages about purchase requisitions.

Purchase Orders

Select this check box to include messages about purchase orders.

Manufacturing Orders

Select this check box to include messages about manufacturing orders.

Transfer Reservations

Select this check box to include messages about transfer reservations.

Planned Orders

Select this check box to include messages referencing planned orders (all order types).

Print Inventory Information

Field Description
Print Part Inventory Summary Data

Select this check box to print inventory summary information for parts of the message. If you select this option, part inventory information by project/warehouse is displayed as a footer each time a new part prints.

Include Inventory Projects

Use this drop-down list to specify the projects whose inventory you would like to include in the report. Valid options are:

  • Selected: Select this option to include inventory from the projects selected on the main screen for the part referenced on the action message. This option is not available if you did not select the Print Part Inventory Summary Data check box.
  • All: Select this option to include inventory from all inventory projects for the part referenced on the action message. This option is not available if you did not select the Print Part Inventory Summary Data check box.
Include Warehouses

Use this drop-down list to specify the warehouses whose inventory you would like to include in the report. Valid options are:

  • Selected: Select this option to include inventory from the warehouses selected on this screen for the part referenced on the action message. This option is not available if you did not select the Print Part Inventory Summary Data check box, or if you did not select the Plan Warehouse Separately check box on the Corporate Settings block of the Configure Material Requirements Planning Settings screen.
  • All: Select this option to include inventory from all warehouses for the part referenced on the action message. This option is not available if you did not select the Print Part Inventory Summary Data check box. This option is selected by default (and cannot be deselected) if you did not select the Plan Warehouse Separately check box in the Corporate Settings block of the Configure Material Requirements Planning Settings screen.