Copy EBOM Subtask

Use this subtask to copy an engineering bills of material (EBOM) from another assembly part/revision.

If the Action Code in the main screen is Change and you use this subtask, the EBOM components will populate the table window on the main screen, but the Action Code for each component line will be blank. If the Action Code in the main screen is Add, Replace, New Revision, or Obsolete, the Action Code for each component line will be Add.

Assembly Part to Copy

Field Description
Part

Enter, or click to select, the assembly part from which you want to copy component parts.

Rev

Enter, or click to select, the assembly part revision from which you want to copy component parts.

Part Lookup Type

From the drop-down list, select the type of parts that you want to view in the Part field Lookup. Valid options are:

  • Standard
  • Provisional
Description

This field displays the description of the selected part.

As-of

Enter, or click to select, the as-of effective date of the BOM for which you want to pull components. Only those components that are effective as of this date will be copied.

Configuration

Enter, or click to select, the EBOM configuration for which you want to pull components. If entered, only those components valid for the specified configuration will be included. This field will be hidden if you did not select the Use Configuration IDs check box on the Configure Bills of Material Settings screen in Costpoint Bills of Material.

Copy All Components

Click this button to copy all components from the selected part.

Copy All EBOM Components

Click this button to copy the effectivity components from the selected part.