Copy Bills of Material

Use this screen to copy bills of material records in the following functions:

  • Engineering bill of material (EBOM) to manufacturing bill of material (MBOM)
  • MBOM to EBOM
  • Proposal bill of material (PBOM) to EBOM
  • PBOM to MBOM

You can use each function to copy only one assembly at a time, although you can validate and copy multiple levels of the specified assembly, as indicated in the BOM Levels group box.

You must have already established the parts/assemblies that are being copied on this screen in the appropriate bills of material (for example, MBOM, EBOM, or PBOM) application.

After entering your specifications, click to start copying the bill of material (BOM).