ECNs

Use this subtask to view all engineering change notices (regardless of status) referencing the part on the selected MPS action message.

Part

This field displays the ID for the part on the selected action message on the main screen.

Rev

This field displays the part revision number.

Description

This field displays the part description.

U/M

This field displays the part's default or inventory unit of measure.

Table Window

Engineering Change Notice

This field displays the ID of the Engineering Change Notice linked to the selected part.

ECN Rev

This field displays the revision number for the ECN (that is, how many times it has been resubmitted for approval).

ECN Description

This field displays a short description of the ECN.

Status

This field displays the status of the ECN, which can be:

Type

This field displays the ECN type assigned to the ECN. ECN types are defined on the Manage Engineering Change Types screen in the Engineering Change Notices module.

Class

This field displays the class assigned to the ECN. Three options are valid:

Priority

This field displays the priority or importance of the ECN. Priority codes are assigned on the Manage Engineering Change Priorities screen.

Reason

This field displays the code classifying the reason for the ECN. Reason codes are defined on the Manage Engineering Change Reasons screen.

Action Code

This field displays the code for the action that the ECN performs on the part:

Original Part

This field displays the identifier of the original part that is affected by the ECN. This field is empty for records with an action code of Add. For lines with an action code of Replace, the original part represents the part to be replaced.

Original Rev

This field displays the revision number of the part that is affected by the ECN. For lines with action code of New Rev, it represents the revision before it is updated.

Original Part Description

This field displays the description of the original part that is affected by the ECN.

Original Status

This field displays the release status of the original part that is affected by the ECN:

Original Part Active

This field displays Y (Yes) or N (No) depending whether or not the Original Part affected by the ECN was active.

Change-To Part

This field displays the ID of the part that replaces the original part. This field is blank for lines with an Action Code of Change, Delete, and Obsolete.

Change-To Rev

This field displays the revision of the part that replaces the original part. For lines with Action Code of New Rev, it represents the revision after it is updated by the ECN.

Change-To Part Description

This field displays the description of the change-to part. For lines with Action Code of Add, this field displays the description of the new part being created by the ECN.

Change-To Status

This field displays the release status that the change-to part is assigned by the ECN:

Change-To CAGE

This field displays the CAGE code of the change-to part to be added by the ECN.

Change-To Make/Buy

This field displays B (Buy) if the change-to part is normally purchased and M (Make) if it is normally manufactured.

Effective Date

This field displays the date on which the modifications were/are to become effective.

Material Disposition

This field displays the code that indicates how existing inventory for the original part will be dispositioned:

Originator

This field displays the employee ID of the person originating the ECN.

Originator Name

This field displays the name of the person originating the ECN.

Organization

This field displays the organization to which the ECN is linked.

ECN Date

This field displays the date on which the ECN originated.

Submit for Approval Date

This field displays the date on which the ECN was submitted for approval.

Approval Date

This field displays the date on which the ECN was approved.

Planned Implementation Date

This field displays the date on which Costpoint part, BOM, and routing changes are planned for implementation.

Implementation Date

This field displays the date on which the Costpoint part, BOM, and routing changes were implemented.

Client Approval Required

This field displays Y (Yes) or N (No) depending on whether or not client approval is required for the ECN.

Client

This field displays the ID of the client for whom the ECN is being prepared.

Client Name

This field displays the name of the client for whom the ECN is being prepared.

Client Approval Status

This field displays the current status of the client approval. Options are:

ECP

This field displays the Engineering Change Proposal (ECP) number assigned to the ECN.

ECP Type

This field displays the current type of the ECP: Formal, Preliminary, or Not Applicable.

ECN CAGE

This field displays the CAGE ID of the entity assigned responsibility to the ECN.

Approval Project

This field displays the ID of the project that is used to determine which users can approve the ECN.

Hold

This field displays Y (Yes) or N (No) depending on whether or not the ECN is on hold.

Originator Phone

This field displays the telephone number of the originator of the ECN.

Originator Phone Ext

This field displays the telephone extension of the originator of the ECN.

Approval Process

This field displays the approval process this ECN is required to pass through before implementation.

Last Change User

This field displays the user ID of the person who made the last change to the ECN.

Last Change Date/Time

This field displays the date and time of the last change to the ECN.

Entry User

This field displays the user ID of the person who originally created the ECN.

Entry Date/Time

This field displays the date and time on which the ECN was originally created.