Reclass |
The ReclassServiceArguments type exposes the following members.
Name | Description | |
---|---|---|
AllowComplete | Determines whether completed control accounts and work packages are recalculated. Optional. Default is false. | |
CopyBaselineDatesToForecastDates | Determines if it will copy the baseline dates to forecast dates. Optional. Default is false. | |
CopyPendingDatesToBaselineDates | Determines whether the pending dates will be copied to the baseline dates. Only applies if all of the following conditions are met: 1. When the SourceClass is a Pending class and the TargetClass is a Budget class. 2. When TargetAction is Replace. If the above conditions are not met, pending dates will not be copied to the baseline dates. Optional. Default is the pending dates will not be copied to the baseline dates. | |
CopyResourceAssignmentCodeFrom | Determines whether the source or target class retains the resource assignment codes. Optional. Default is Source. | |
Criteria | The criteria to use for the reclass process. Default is 'Total Project'. The available criteria will change based on the project and the terms and codes defined on the project. Some typical criteria include: * Total Project * Control Account (the Control Account term) * Work Package (the Work Package term) * WBS (the name given to the CA1 key field) * OBS (the name given to the CA2 key field) * WP (the name given to the WP key field) * Resource * Resource Assignment * CAM (the Control Account Manager term) | |
EndDateLabel | The calendar set 00 label of the last period to reclass. Optional. This EndDateLabel is only used if PeriodFilter is set to DateRange | |
IncludeChildren | Determines whether the reclass process will include child elements of the selected criterion. Optional. Default is false. | |
IncludeForecastInUpdateTotals | Determines whether Cobra will update the Estimate At Complete (EAC) values for the project after reclass. Only applies if the target class is a forecast class. Optional. Default is false. | |
Log | Determines the comment, change number and 'significant' setting for changes that affect the log. See ProjectAuditLogDescription. | |
PeriodFilter | The period range to recalculate. Optional. Default is All so all periods are reclassed. If DateRange is used, the StartDateLabel and EndDateLabel values must be specified. | |
Project | The project that will be reclassed. Required. | |
Selection | The the criteria filter that controls the portion of the project that is reclassed. The selection must be consistent with the Criteria setting. Ignored if Criteria is set to Total Project. Required for all other Criteria values. Examples: * If Criteria = "Control Account", use a Control Account key value: 1.1 / 1000 * If Criteria = "WBS", use a WBS ID: 1.2.1 * If Criteria = "Resource", use a resource ID: ASTRO * If Criteria = "Resource Assignment", use a Resource Assignment key: 1.2 / 1200 / 01 / ASTRO | |
SourceAction | The action that will be performed on the source cost class. Required. | |
SourceClass | The source cost class from which costs will be copied. Required. | |
StartDateLabel | The calendar set 00 label of the first period to start reclassing. Optional. This StartDateLabel is only used if PeriodFilter is set to DateRange | |
TargetAction | The action that will be performed on the target cost class. Required. | |
TargetClass | The target class where costs will be copied to. Required. |