Rolling Wave Dialog Box of the Project Properties Dialog Box
Use this dialog box to run the rolling wave process without advancing the calendar at the same time.
You can run the rolling wave process outside of the Advance Calendar utility to fix expanded date problems.
Contents
Field | Description |
---|---|
Periods prior to status date | Use this field to enter the number of periods before the status date that you want to expand. |
Periods following status date | Use this field to enter the number of periods after the status date that you want to expand. |
Update rate sets used with FTE result codes | Select this option to expand any rate with the result code F into the sub-period rates for all the rate files in the project. Selecting this option enables accurate calculation of FTEs when looking at sub-periods versus period data.
If you have permission to advance the calendar, you can update the FTE rate sets even if you do not have write access to the rate file. |
Parent Topic: Files Tab of the Project Properties Dialog Box