Upload a Schedule for the Current Period
Use the Submittals hub to upload a Deltek Open Plan (.bk3), Microsoft Project (.mpp), or Primavera P6 (.xer or .xml) schedule for the current period.
You can upload and re-upload your schedule as many times as you want to before the Window Close Date; however, only one schedule per period is accepted so each time you upload, the previous snapshot/schedule is overwritten. For example, you may have uploaded your schedule and then realized that there was an error in it. You can upload a new one which will overwrite the previous one.
Note:
- If a user or group has Read Only access to a project (set on the Access Control tab), they cannot upload a schedule for that project.
- If you submit a schedule and the Time Now value is not current, Touchstone includes a warning in the email after the schedule is submitted. If you try to submit a schedule when the Time Now value is not current and the option to Reject submittals if the time now date is not current has been selected on the Projects Configuration tab, Touchstone displays a warning message and the schedule is not uploaded. "Current" is defined on the Projects Configuration tab.
- If the Window Close Date has passed, you can no longer use these steps to upload the schedule. See Upload a Schedule for a Prior Period.
To upload your schedule for the current period: