Default Metrics Templates
Touchstone includes a set of default metrics templates.
The following are the default metric template groups that are included with the Touchstone installation:
- Default
- Advanced: Schedule, cost, performance, risk, earned value metrics.
- Baseline Compliance
- Characteristics
- Completed
- Constraints
- Cost
- Duration
- Earned Schedule
- Earned Value
- Earned Value Work
- Float
- In-Progress
- Lags
- Logic
- Planned
- Risk Exposure
- Risk Inputs
- Scenario Comparison
- Status
- Work / Resources
- Advanced: Schedule, cost, performance, risk, earned value metrics.
- Industry Standards
- DCMA 14 Point: Metrics for evaluating a schedule against the DCMA''s 14 Points.
- GAO: Metrics evaluating compliance to help meet the intent of the GAO Schedule Assessment Guide.
- 1 Activities
- 10A Baseline Start
- 10B Baseline Finish
- 2 Sequence
- 3 Resources
- 4 Duration
- 5 Integration
- 6 Critical Path
- 7 Float
- 8A Risk Inputs
- 8B Risk Exposure
- 9 Dates
Parent Topic: Learn More About...