Update Project Period of Performance

Use this toolkit to update the PROJ and PROJ_EDIT tables with the period of performance data from the PROJ_MOD table.

Specifically, Costpoint uses the Start and End Date fields (PROJ_START_DT and PROJ_END_DT, respectively) from the PROJ_MOD table to update the same columns in PROJ. Use this toolkit whenever you have uploaded information into the PROJ, PROJ_EDIT, or PROJ_MOD table. Project modifications update the project at the level of entry and all project levels above the level of entry.