PRINT BILLS OF MATERIAL MRP ACTION MESSAGE REPORT

Use this screen to print MRP action messages based on parts in one or more manufacturing bills of material (MBOMs). This report allows you to view all of the outstanding action messages for all of an end item's subassemblies and components (and the end-item itself) at one time. You can also filter messages based Master Production Scheduling (MPS) plan, inventory project, message type, and warehouse, and control the explosion of assemblies to any level you wish. You can print a detailed, indented report sorted by MBOM, or sort a summarized list of parts by part number, message type, commodity, or make/buy code.

Location

Identification

Use the fields in this block to create a new parameter ID or to retrieve a previously saved parameter ID. A parameter ID represents a set of screen selection parameters. After you have saved a parameter ID and its related parameters, you can retrieve them using Query.

You can use the retrieved parameters to produce reports and run processes more efficiently and with greater consistency. The saved parameters are also useful and necessary when you want to run the process as part of a batch job. Many users save a unique set of parameters for each different way they run a report or process. When you select a previously saved parameter ID or parameter description, the associated saved screen selection parameters automatically display as selection defaults. The page setup and print options are also included in the saved parameter ID if there are any. You can change any of the associated selection defaults as necessary.

Parameter ID

Enter, or click to select, a parameter ID of up to 15 alphanumeric characters. Choose characters for your parameter ID that help identify the type of selections you made in the screen, such as PERIOD or QUARTERLY.

When you save your record, all the selections made in the screen are stored with the parameter ID. Later, you can retrieve the parameter using Query.

You can use the parameter to run the process more efficiently because you can select the parameter ID with its previously defined screen selections. After the default selections display in the screen, you can override the defaults.

Description

Enter, or click to select, a parameter description of up to 30 alphanumeric characters.

Selection Ranges

Use this Group box to specify the range of information you want to include in this report.

Assembly Part/Rev

The Option filed always displays One. Use the Start field to enter, or use to select, the end-item assembly part and revision whose subassembly/component parts' action messages you want to include on the report. Use the adjacent field to enter, or use to select, the revision number for the assembly part.

To include action messages for multiple end-item assembly parts, select the Non-Contiguous Ranges check box and use the Assembly Part/Rev Non-Contiguous Ranges subtask to create a list of end-item parts and revisions.

As of Date

The Option filed always displays One. Use the Start field to enter, or use to select, the MBOM as-of date you want to use to use to explode the assembly part's MBOM.

Configuration

The Option filed always displays One. Use the Start field to enter, or use to select, the MBOM configuration ID for the system to use to explode the assembly part MBOM.

Warehouse

Use the drop-down list to select the range of warehouses whose action messages you would like to include in the report. The available options are:

Use the Start and End fields to enter, or use to select the starting and ending warehouses for the selected range, as applicable.

Inventory Project Selection

Use this group box to specify the projects or netting groups that you want to include in this report.

Selection Option

Use the drop-down list to select the inventory projects/netting groups that you want to include in the report.

Project

Use the drop-down list to select the range of inventory projects you want to include in this report. The available options are:

Use the Start and End fields to enter, or use to select the starting and ending project for the selected range, as applicable.

Netting Group

Use the drop-down list to select the range of netting groups you want to include in this report. The available options are:

Use the Start and End fields to enter, or use to select the starting and ending netting groups for the selected range, as applicable.

Sort By

Use this group box to specify sorting options for this report.

1st Sort

Use this drop-down list to select whether to sort this report by Indented MBOM, Summarized MBOM - Part, Summarized MBOM - MRP Action Message, Summarized MBOM - Commodity, or Summarized MBOM - Make/Buy.

Options

Use this group box to specify additional option for this report.

MPS Plan

Use this field to enter, or use to select, the code of the MPS plan for which you want to view MRP action messages. Keep the default of P (Production) if you want to see action messages for the official production plan. Enter a different code to see action messages for a "what-if" scenario.

Include Parts w/No Messages

Select this check box to include parts in the selected end-item MBOMs that do not have messages. If you elected to sort the report by Indented MBOM, this field is disabled, and parts without messages are included in the report.

Select MBOM Levels

Use this group box to specify the level of component explosion you want to include in the report.

BOM Levels

Use this drop down list to select the level of component explosion for this report. The available options are:

Explode Lowest Level Phantoms

Clear this check box to stop the explosion of phantom parts at the lowest specified level in the Select MBOM Levels group box. If you selected All Levels, this check box is cleared and disabled. Otherwise, the check box is selected by default, and phantom parts at the lowest selected level are exploded as far as possible (until no further phantom components are found) on the report.

Select Message Types

Use the options in this group box to select the message types to include in the report. You must select at least one message type.

Planned Order

Select this check box to include planned order action messages.

Cancel Order

Select this check box to include cancel order action messages.

Decreased Quantity

Select this check box to include decrease order quantity action messages.

Reschedule Order

Select this check box to include reschedule order action messages.

Substitute Part

Select this check box to include substitute part action messages.

Inactive Inventory

Select this check box to include inactive inventory abbreviation action messages.

Engineering Change

Select this check box to include messages for parts that have open engineering change notices.

Maximum Lot Qtuantity

Select this check box to include messages for supply orders that exceed the maximum lot size quantity for the component/subassembly part, as defined in the Manage Part Project Data screen in Costpoint Product Definition.

Transfer Reservation

Select this check box to include transfer reservation action messages.

Subtask

Subtask

Description

Assembly Part/Rev Non-contiguous Ranges

Click this link to open the Assembly Part/Rev Non-Contiguous Ranges subtask and create a list of end-item parts and revisions for the report.