The Labor Detail report provides a detailed look at the labor activity related to a project.

You can use this report as a stand-alone report or as a drill-through target from other reports, like the Project Status Report.

Note: The Labor Detail report retrieves data from one database table (Report Project Labor Summary (RPT_PROJ_LAB_SUM)) designed to provide a snapshot of results for a particular point in time, while the Project Status Report retrieves data from a different database table (PSR) also designed to provide a snapshot of results for a particular point in time. If the database tables were updated at different times, when you drill through from the Project Status Report, some results may vary. To ensure that drill-through data is the same as the parent Project Status Report, update the PSR and Labor Summary tables on the same schedule.

Prompts

Use the Labor Detail prompts to configure the report.

Labor Detail Report

This is a sample of the Labor Detail report.