Labor Plan Summary General Tab

Use the General tab to select report options for the Labor Plan Summary report and to save sets of options for reuse.

Contents

Field Description
Report Name You can change the default report name.
Maximum Task Level Select the number of task levels to include. The maximum number is 12.

For example, you have a plan with the following rows:

PlanningRow 1

PlanningRow 1.1

PlanningRow 1.1.1

PlanningRow 1.1.2

PlanningRow 1.2

PlanningRow 1.2.1

If you select 1 in Maximum Task Level, the report only displays PlanningRow 1.

If you select 2 in Maximum Task Level, the report displays the following:

PlanningRow 1

PlanningRow 1.1

PlanningRow 1.2

Base on Select the version of the plan on which you want to base the report:
  • Planned — Base the report on the current plan, which includes any updates or adjustments made since the plan's inception)

  • Baseline — Base the report on the version of the plan that is saved as the baseline.

Decimal Setting Select the number of decimal digits to display for hours or amounts. Your options are the following:
  • No Decimal — The report displays the number of hours without decimal digits (12).

  • 1 Digit — The report displays the number of hours with one digit to the right of the decimal point (12.1).

  • 2 Digits — The report displays the number of hours with two digits to the right of the decimal point (12.13).

Only include plans marked for Utilization and Project Reports If you select this option, the report includes only those plans that you select in the Plan Lookup dialog box for which the Include in Utilization and Project Reports option is selected on the General tab of the Project Planning form.

If you do not select this option, the report includes all plans that you select in the Plan Lookup dialog box.

Only Include Tasks with Planned or JTD Hours Select this check box if you want the report to include those tasks that have planned hours or job-to-date hours.