Drill Down to a Report from a Visualization Map

To display supporting detail for a block on a visualization map, you can drill down to related reports. This option is only available if you first specify the reports that you want to be available as drill-down reports on the Drill Down Reports tab of the Options dialog box for the visualization.

To drill down to a report from a visualization map, complete the following steps:

  1. Right-click the block from which you want to drill down.
  2. On the shortcut menu, click the option for the drill-down report you want.

    The shortcut menu contains an option for each drill-down report you set up on the Drill Down Reports tab of the Options dialog box. Those options are at the top of the menu. For example, if you set up a drill-down report named Project Earnings, the menu contains a Run Project Earnings option.

    Vision displays the drill-down report in a separate window.