Field | Description |
Report Name
|
You can modify the default report name.
|
Format
|
Select one of the following to indicate the data that you want the report to display:
-
Hours
-
Cost Amount
-
Billing Amount
-
Revenue
Your access to labor cost rates and amounts may be restricted by role security.
|
Period Scale
|
Select one of the following period scales:
For example, if you want the report to display monthly totals of hours or amounts, select
Monthly.
|
Decimal Setting
|
Select the number of decimal digits to display for hours or amounts.
If you select
Hours in
Format, your options are the following:
-
No Decimal — The report displays the number of hours without decimal digits (12).
-
1 Digit — The report displays the number of hours with one digit to the right of the decimal point (12.1).
-
2 Digits — The report displays the number of hours with two digits to the right of the decimal point (12.13).
If you select
Cost Amount,
Billing Amount,
or Revenue in
Format, your options are the following:
-
No Decimal — The report displays amounts without decimal digits (12).
-
Currency — The report displays amounts with the number of decimal digits specified for the currency on the Currency Configuration form.
|
Start Day of the Week
|
If you select
Weekly or
Bi-Weekly in
Period Scale, select the starting day of the week.
The default selection is the day specified in
Starting Day of Week on the Plan Settings form ().
|
Range
|
Select the number of reporting periods to display. The maximum number is 20.
This option determines the number of periods, and the
Period Scale option determines the type of period. For example, if you select
Monthly in
Period Scale and
6 in
Range, the report displays data for six monthly periods.
|
Column Width
|
Enter the width of the data columns in inches or millimeters based on which one you selected in the
Unit of Measure field on the Layout tab of the Options dialog box.
|
Start Date
|
Select the starting date for the data on the report:
-
Today — The report displays data starting with the current date.
-
Specific Date — The report displays data starting with the date you specify. Enter the date, or click
and select the date.
|
Show
|
Select the types of hours or amounts you want the report to display.
If you select
Hours in
Format, you can select the following:
-
Planned Hours
-
Actual Hours
-
Baseline Hours
If you select
Cost Amount in
Format, you can select the following:
-
Planned Cost Amount
-
Actual Cost Amount
-
Baseline Cost Amount
-
Compensation
Your access to labor cost rates and amounts may be restricted by role security.
If you select
Billing Amount in
Format, you can select the following:
-
Planned Billing Amount
-
Actual Billing Amount
-
Baseline Billing Amount
-
Compensation
If you select
Revenue in
Format, you can select
Planned Revenue.
|
Height
|
Enter the height of the graph in inches or millimeters based on which one you selected in the
Unit of Measure field on the Layout tab of the Options dialog box.
|
Show
|
Select the types of hours or amounts you want the graph to display.
If you select
Hours in
Format, you can select the following:
-
Planned Hours
-
Actual Hours
-
Baseline Hours
If you select
Cost Amount in
Format, you can select the following:
-
Planned Cost Amount
-
Actual Cost Amount
-
Baseline Cost Amount
-
Compensation
Your access to labor cost rates and amounts may be restricted by role security.
If you select
Billing Amount in
Format, you can select the following:
-
Planned Billing Amount
-
Actual Billing Amount
-
Baseline Billing Amount
-
Compensation
If you select
Revenue in
Format, you can select
Planned Revenue.
|
Only include plans marked for Utilization and Project Reports
|
If you select this option, the report includes only those plans that you select in the Plan Lookup dialog box for which the
Include in Utilization and Project Reports option is selected on the General tab of the Project Planning form.
If you do not select this option, the report includes all plans that you select in the Plan Lookup dialog box.
|
Show Cumulative Totals
|
If you select this check box, the report displays cumulative totals from one period to the next for actual, baseline, and planned values.
If you do not select this check box, the report displays the actual, baseline, and planned values for each period alone.
For example, if the actual hours for March 2009 are 250 and the actual hours for April 2009 are 350, the report displays
250 for March 2009 and
600 (250 + 350) for April 2009 if you select
Show Cumulative Totals. If you do not select
Show Cumulative Totals, the report displays
250 for March 2009 and
350 for April 2009.
|