Open Plan 8.8 Help

Assigning a View to a Resource Pool

There are several ways to assign a resource view to a resource pool.

Use any of the following features:

  • Drag-and-drop
  • Copy-and-paste
  • Choose a Resource pool dialog box

Assign a View to a Resource Pool Using Drag and Drop

Use this procedure to assign a view to a resource pool using the drag-and-drop feature.

Assign a View to a Resource Pool Using Copy and Paste

Use this procedure to assign a view to a resource pool using the copy-and-paste feature.

Assign a View to a Resource Pool Using the Choose a Resource Pool Dialog Box

Use this procedure to assign a view to a resource pool using the Choose a Resource Pool dialog box.