Time Analysis Dialog Box


Time Analysis Dialog Box

The Time Analysis dialog box displays when you select a project and click Time Analysis > Options on the Processes tab, or you click Time Analysis but you have not entered a Time Now for the project.

Options Tab

The Options tab of the Time Analysis dialog box controls the way in which Open Plan calculates time analysis.

Advanced Tab

Use the Advanced tab to set the Multiple Ends and Out of Sequence time analysis processing options.


Parent Topic:

Tabs and Dialog Boxes