Open Plan 8.8 Help

Tabs and Dialog Boxes


Activity Details Dialog Box

Activity Information Dialog Box

Activity Tree Dialog Box

The Select Activity dialog box allows you to change the target activity without having to exit the tool, select a new activity, and re-run the tool.

Add Relationships Dialog Box

Use the Add Relationships dialog box to define logical predecessor and successor activities.

Add Relationship Dialog Box

Relationship information defines the logical relationship between activities in your project.

Assign Multiple Resources to Multiple Activities Dialog Box

This dialog box allows you to assign multiple resources to any number of activities at one time.

Delete Activity Dialog Box

When you delete a single activity from a project, you can use this dialog box to instruct Open Plan to take one of the following actions:

Dictionaries Dialog Box

The Dictionaries dialog box enables you to open and close user dictionaries and to edit the contents of an open user dictionary.

Edit Relationship Dialog Box

Use this dialog box to edit a relationship between activities. It defines the relationships between activities using the following settings:

Find Code Dialog Box

This dialog box features an input box and options that you can use to specify the manner in which Open Plan should conduct a search for the code.

Link/Unlink Activities Dialog Box

Use this dialog box to add and remove multiple relationships of the same type between activities conveniently.

Move Activities Dialog Box

Use this dialog box to move activities from one external subproject to another, or from an external project to a master project.

Open External Subprojects Dialog Box

When you open a project containing external subprojects, Open Plan displays the Open External Subprojects dialog box, which contains a hierarchical list of external subprojects (and externals embedded within the top layer of externals).

Output Fields Dialog Box

Use the Output Fields dialog box to customize the columns that you want to display either on the Path Details or Summary Path report.

Redundant Logic Dialog Box

After running redundancy analysis, use this dialog box to view and delete the redundant relationship.

Replan Activity Dialog Box

Use this dialog box to set options for replanning an activity.

Select Code Dialog Box

This dialog box works with the values on the Codes tab of Activity Details dialog box and Project Properties dialog box.

Spread Method Dialog Box

This dialog box displays a list of spread curves that you can use to respread the total quantity of the selected resource over the activity’s original duration.


Parent Topic:

Working with Activities