The Consultants tab contains a toggle button that allows you to switch the grid to display the amounts in billing or cost.
This toggle button displays on the Consultants tab under the following circumstances:
- The project has a Vision plan and the
Calculate Consultant Billing Amounts option is selected on the Rates tab of Project Planning. If the project has multiple Vision plans that are included in utilization, the setting on the plan with the earliest creation date is used.
- The project has a Navigator plan and the
Calculate Consultant Billing from Cost option is selected on the Plan Settings dialog box in Navigator.
To switch the amount from billing to cost, complete the following steps:
-
Select a project on the Planning tab.
-
Select the Consultants option on the menu bar.
The billing amounts display on the Consultants grid with the Bill option selected.
-
Click or slide the toggle to select the Cost option.
The grid updates to display amounts in the Baseline, Planned, JTD, and Planned Less JTD columns.