Preferences Tab of the Project Properties Dialog Box
Use this dialog box to set up different options for your project, as well as options for processes that are run against your project.
Note: The options on this dialog box are controlled by their corresponding options in the
tab node of the EPM Security Administrator tool.
On this dialog box, you can specify your preferences for the following:
- Actual Cost Preferences
- Advance Calendar Preferences
- Analyze Preferences
- ANSI EIA X12 Preferences
- Integration Wizard Preferences
- Project Preferences
- Earned Preferences
- Forecast Preferences
- Recalc Preferences
- Reclass Preferences
- Replan Preferences
Contents
Field | Description |
---|---|
Copy Preferences | Click this button to copy the existing preferences to another project or to multiple projects. |
- Related Topics:
- Using the Selected and Secure Check Boxes
Use the Selected and Secure check boxes to manage the behavior of the corresponding option on the process wizard page. - Actual Costs Preferences
Use this dialog box to select the options for the loading of actual costs against a project. - Advance Calendar Preferences
Use this dialog box to select the options for advancing the calendar. - Analyze Preferences
Use this dialog box to select the options for analyzing a project and its structures. - ANSI EIA X12 Preferences
Use this dialog box to select options for the ANSI EIA X12 wizard, which lets you export project information to other applications that support Version 3040 or Version 3050 of the ANSI EIA X12 Transaction Set 839 Project Cost Reporting. - Integration Wizard Preferences
Use this dialog box to select the options when importing data into Cobra. - Project Preferences
Use this dialog box to select the options for the budgets in the selected project. - Earned Preferences
Use this dialog box to select the options for calculating earned value. - Forecast Preferences
Use this dialog box to select the options for performing forecast calculations. - Recalc Preferences
Use this dialog box to select the options for performing recalculations. - Reclass Preferences
Use this dialog box to select the options for running the Reclass utility, which allows you to change, copy, or replace an existing cost class. - Replan Preferences
Use this dialog box to select the options for replanning a project or its individual components. - Copy Preferences Dialog Box
Use this dialog box to copy project preferences to other projects. - Procedures
Use the procedures to copy project preferences.
Parent Topic: Project Properties Dialog Box